<br />To facilitate its review of the report, the Committee appointed an
<br />Engineering Advisory Subcommittee to study and consider the various engineering
<br />aspects of the Bureau report. The Committee has reviewed and accepted t~o re-
<br />ports from such Subcommittee. The Subcommittee consists of Royce J. Tipton,
<br />Consulting Engineer, Colorado Water Conservation Board, Chairman; Frank C.
<br />Merriell, Secretary-Engineer, Colorado River I/ater Conservation District Board,
<br />Grand Junction, Colorado; R. M. Gildersleeve, Chief Engineer, Colorado Water
<br />Conservation Board; C. H. Jex, Area Engineer, Bureau of Reclamation, Grand
<br />Junction, Colorado; Ben F. Powell, Area Engineer, Bureau of Reclamation,
<br />Pueblo, Colorado; and J. R. Riter, Head of Division of Hydrology, Branch of
<br />Project Planning of the Bureau of Reclamation, Denver, Colorado.
<br />
<br />The Policy and Review Committee was organized and held its first
<br />meeting on November 24, 1948. It has met on the average of once every sixty
<br />days since its work was started, At such meetings, reports of the Engineering
<br />Advisory Subcommittee were considered, as well as a draft of a sp~cial report
<br />of Region 7, Bureau of Reclamation, on the project, dated September 1949,
<br />which incorporated changes made in the June 1948 draft of report due to studies
<br />conducted subsequently by the Bureau. In the periods between meetings, engineers
<br />on the stAff of the Statc Water Board, Bureau Engineers, and Frank Merriell,
<br />Engineer for the Colorado River Conservation District Board, made extensive
<br />reviews of the Bureau report on the project and of various engineering questions
<br />which arose. The Committee considered extensively various questions of policy..
<br />Minutes of the meetings of the Committee and the reports of the Engineering
<br />Advisory Subcommittee are available in the office of the Water Board.
<br />
<br />On January 24, 1950, as a result of action taken by the Committee,
<br />Clifford H, Stone, Chainnan of the Committee, transmi.tted to Avery A. Batson,
<br />Director of Region 7, Bureau of Reclamation, a letter marked "Exhibit A,"
<br />which is made a part of this report. A review of this letter will indicate
<br />that the Committee had reached certain tentative conclusions when the letter
<br />was written. The letter was transmitted to the Regional Office of the Bureau
<br />of Reclamation in order to enable that office to revise its report in keeping
<br />with the views and recommendations contained in the letter. It was pointed out
<br />that certain questions affecting project operation and the principles which
<br />carried out the policies of the State respecting the exportation of water from
<br />the natural basin of the Colorado River in Colorado, remained to be formulated
<br />and considered by the Policy and Review Committee; and it was explained that
<br />such policies and principles would be submitted to the Bureau in due course.
<br />
<br />At the January meeting of the Committee, a Drafting Subcommittee was
<br />appointed, consisting of Jean S, Breitenstein, Attorney for the Colorado Water
<br />Conservation Board, Chairman; Harold H. Christy, representing the Arkansas
<br />Valley; Frank C, Delaney, representing ~estern Colorado; Cleland Feast, repre-
<br />senting the Colorado Game and Fish Commission; and Ben F. Powell, representing
<br />the Bureau of Reclamation. This Drafting Subcommittee held several meetings
<br />and on the 14th day of April, 1950, submitted to the Policy and Review Committee
<br />its report.