My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08949
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:20 PM
Creation date
10/12/2006 3:22:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147.100
Description
Arkansas River-Arkansas River Basin Water Projects-Gunnison-Arkansas Project
State
CO
Basin
Arkansas
Water Division
2
Date
6/15/1950
Author
PolicyReviewCommitte
Title
The Policy and Review Committee First Phase Gunnison-Arkansas Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-J- <br /> <br />The Policy and Review Committee, on June 7-8, 1950, met for the purpose <br />of considering the report of the Drafting Subcommittee. DUring that two day <br />period, a number of amendments to the operating principles, recommended by the <br />Drafting Subcommittee, were made. As amended, the report of the Drafting Su~ <br />committee was unanimously adopted by the Policy and Review Committee. Thus, this <br />amended report of the Drafting Subcommittee becomes and is hereby submitted as a <br />part of this report of the Policy and Review Committee to the Colorado Water <br />Conservation Board. There is attached hereto and marked "Exhibit B" such report <br />of the Drafting Subcommittee as amended. <br /> <br />Jt is understood that the Policy and Review Committee was set up to <br />advise and make recomffienqations to the Colorado Water Conservation Board with <br />respect to the first phase of the proposed Gunnison-Arkans~s Project. Aside <br />from providing machinery for effective review of the preliminary draft of the <br />Bureau of Reclamation report on this project, such procedure was designed to <br />effectuate an acceptable arrangement and agreement between Eastern and Western <br />Colorado for the exportation of water from the natural basin of the Colorado <br />River by this particular project; and it envisioned the application of the prin- <br />ciple, adopted in Colorado, of protecting the present and potential uses of <br />Colorado River water in the natural basin in Colorado in relation to a proposed <br />Federal Exportation Project. It is further understood that comments of the <br />State of Colorado with respect to this particular project would not become <br />effective for submission to Region 7 of the Bureau of Reclamation until final <br />action has been taken on the matter by the Colorado ~ater Conservation Board. <br />If the report of the Policy and Review Committee is approved by the Colorado <br />Water Conservation Board or approved with cert~in amendments, then it will be- <br />come the official, informal State comments on this project to Region 7 of the <br />Bureau of Reclamation. After submission by Region 7 of its report to the <br />Commissioner of the Bureau and the Secretary of the Interior, the report on this <br />particular project in its final form will Again be referred to Colorado and the <br />other six States in the ColoradO River Basin for final comments. <br /> <br />The Policy and Review Committee recommends to the Colorado Water <br />Conservation Board the approval of informal co~ments on the first stage of the <br />proposed Gunnison-Arkansas Project to Region 7 of the Bureau of Reclamation on <br />basis of the report here submitted. <br /> <br />Respectfully submitted, <br />- , <br />~-: (.:...."~,.. / <br />!. J'/ / ,>I);.~- .,,' <br />~. I' <br />/- <br />( ,.- j;i rd H. Stone, Chairman <br />Policy and Review Committee <br /> <br />06Gl <br />
The URL can be used to link to this page
Your browser does not support the video tag.