My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08948
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:20 PM
Creation date
10/12/2006 3:22:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1983
Title
Monthly Progress Report - Aquatrain Project - December 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />r-.. <br /> <br />Continue identification of other CO2 sources. <br /> <br />Begin survey of CO2 markets, particularly in southern California <br />area. <br /> <br />.....~ <br /> <br />"'1' <br />,,"j <br />(..) <br /><.. ~. <br /> <br />6.0 SUBTEAM: ENVIRONMENT/CORRIDOR/FEDERAL PERMITTING/ <br />ENERGY MANAGEMENT (Fite) <br />6.1 DECEMBER EVENTS <br /> <br />Division of EIS Services (BLM) incorporated Forest Service <br />comments into the final revision of the Corridor Study. <br />The maps were revised and edited and word processing completed <br />on the study report. <br /> <br />Review continues on the Relamation/Forest Service Memorandum <br />of Understanding. <br /> <br />Western Area Power Administration completed their analysis <br />of the cost and use of excess energy produced from fluidized- <br />bed combustion chambers that would be used to burn excess <br />oxygen from flue gases to produce CO2 for AQUATRAIN. A <br />draft of the report was forwarded to Reclamation. <br /> <br />Attended public hearing for White Pine Power Project draft <br />EIS in Henderson, Nevada, on December 16. Aquatrain, Inc., <br />submitted to BLM the comments on the White Pine Power Project <br />draft EIS. <br /> <br />Completion of Preliminary Report placed on hold until review <br />of cost estimates and technical details is completed by <br />Arthur O. Little & Co. <br /> <br />Completed details of project activities required before <br />work can begin on the Project EIS. <br /> <br />6.2 ANTICIPATED JANUARY EVENTS <br /> <br />Come to agreement with Forest Service on Memorandum of Understanding <br />and submit to Reclamation Solicitor for review. <br /> <br />Western Area Power Administration to submit final report <br />on the potential for sale of excess power from fluidized- <br />bed combustion chambers. <br /> <br />Oivision of EIS Services (BLM) to complete internal review <br />of Corridor Study Report and submit to Reclamation for review <br />to print. <br /> <br />Arthur D. Little & Co. to complete review of cost estimates <br />and technical details for conceptual project configuration. <br /> <br />Prepare and submit a work order to Oivision of EIS Services <br />(BLM) under the Reclamation/BLM Interagency Agreement. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.