My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08930
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08930
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:13 PM
Creation date
10/12/2006 3:21:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407
Description
Platte River Basin - River Basin General Publications
State
CO
Basin
South Platte
Water Division
1
Date
5/1/1991
Author
NCWCD
Title
Draft Report - Regional Water Supply Study - Part I - Report
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-14- <br /> <br />I <br />I <br />I <br />I <br />I' <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Alternatives for helping to meet the largest future needs were then concep- <br />tually planned first. Those conceptual plans were subsequently modified to <br />include the future requirements of as many additional entities as possible. <br /> <br />Some of the entities having future needs were not included because of their <br />close proximity to already developed water supply facilities owned and <br />operated by other entities which should be capable of more economically <br />meeting future needs. Other entities were not considered because they were <br />too remotely located and their future requirements were too small to <br />economically participate in regional facilities. Still others were not <br />included because their existing water supply facilities were not well-suited <br />to be joined to the regional facilities conceptually planned. <br /> <br />Regional Plan Co.ponents <br /> <br />Five individual planning components, denoted Components A through E, along <br />with associated options, were eventually developed. Each planning component <br />was devised to be independent from the others so that each could be <br />implemented separately, or not implemented, as future conditions warrant. <br /> <br />Each of the components consisted of an alternative for expanding conveyance <br />capabilities, and water treatment capabilities in some instances, for M&! <br />water supplies. Enhanced conveyance was determined to be especially needed <br />for implementing any additional level of regional water supply integration. <br />Adding future water treatment capacity at a regional level was only <br />considered because of the potential for significant savings in costs through <br />economies of scale. However, none of the alternatives involved diminishing <br />the use of existing facilities or diminishing the roles of existing water <br />providers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.