My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08921
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:11 PM
Creation date
10/12/2006 3:21:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.100
Description
Narrows Unit - Project Description
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1967
Title
Report on the Narrows Unit Colorado South Platte Division Missouri River Basin Project part 2
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />.... r"" <br />:,C'.' ....I <br /> <br />Conclusions and Recommendations <br /> <br />OM&R expenses for irrigation also would be paid by the conservancy <br />district. Joint reservoir OM&R expenses assigned to flood control, <br />recreation, and fish and wildlife enhancement are nonreimbursable. <br />Specific OM&R expenses directly incurred for recreation and fish and <br />wildlife would be borne by the non-Federal agency assuming adminis- <br />trative management responsibility for these functions of the reservoir. <br /> <br />Repayment of capital costs would total $27,998,000 by the end of <br />the 50-year repayment period. Irrigation repayment would be non- <br />interest-bearing; recreation and fish-wildlife repayable allocations <br />would bear interest. Reimbursable allocations by purposes are as <br />follows: <br /> <br />Irrigation, project cost <br />Recreation: <br />Project cost <br />Interest during <br />construction <br /> <br />$26,199,4.00 <br /> <br />$1,277,800 <br /> <br />29, 500 <br /> <br />1,307,300 <br /> <br />Fish and wildlife: <br />Project cost <br />Interest during <br />construction <br /> <br />4.66,4.00 <br /> <br />. <br /> <br />24.,900 <br /> <br />4.91,300 <br />$27,993,000 <br /> <br />Total <br /> <br />Residents of the area for many years have sought means of obtain- <br />ing a supplemental water supply for their lands and relief from the <br />devastating floods which occur in this region. They have vigorously <br />supported the investigations and have contributed to them financially. <br /> <br />The plan of development has been formulated for this report with <br />primary consideration given to operation of the potential Narrows <br />Reservoir for downstream lands in the Lower SOQth Platte Water <br />Conservancy District. However, in the interest of comprehensive <br />resource development in the South Platte River Basin, full considera- <br />tion will be given to possibilities for the exchange of water for <br />the benefit of upstream lands. <br /> <br />107 <br /> <br />*. <br />
The URL can be used to link to this page
Your browser does not support the video tag.