Laserfiche WebLink
<br />$ 22500 <br />$ 7500 <br />$ 7500 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />AMITY MUTUAL IRRIGATION COMPANY <br /> <br />DESCRIPTION OF WORK AND COST ESTIMATE <br /> <br />AMITY CANALlContinuodl <br /> <br />18. St~aighten Canallmiles 79.5 to 79.8l <br /> <br />Relocate canal on st~aight alignment; ~eclaim existing <br />alignment; extend Hutchinson Late~al to new alignment. <br /> <br />EXCAVATION <br />COMPACTED EMBANKMENT <br />FILL <br /> <br />15000 CY @ $1,50 <br />7500 CY @ $1,00 <br />7500 CV @ $1. 00 <br /> <br />Subtotal fo~ St~aighten Canal: <br /> <br />19, Cheyenne Wastewaylmile 79.9l <br /> <br />Replace st~uctu~e. <br /> <br />REf10VE CONCRETE <br />EXCAVATION <br />COMPACTED BACKFILL <br />STRUCTURAL CONCRETE <br /> <br />1 EA @ $5000 <br />40 CV @ $3,50 <br />30 CV @ $7.00 <br />40 CY @ $325 <br /> <br />Subtotal fo~ Cheyenne Wasteway: <br /> <br />20, Cheyenne D~op St~uctu~elmile 81.0l <br /> <br />Const~uct new st~uctu~e. <br /> <br />EXCAVATION <br />COMPACTED BACKFILL <br />STRUCTURAL CONCRETE <br />EROSION PROTECTION <br /> <br />80 CV @ $3,50 <br />60 CY @ $7,00 <br />80 CY @ $325 <br />1 EA @ $5000 <br /> <br />Subtotal for Cheyenne D~op Structu~e: <br /> <br />$ 37500 <br /> <br />$ 5000 <br />$ 140 <br />$ 210 <br />$ 13000 <br /> <br />$ 18350 <br /> <br />$ 280 <br />$ 420 <br />$ 26000 <br />$ 5000 <br /> <br />$ 31700 <br /> <br />TOTAL FOR AMITY CANAL: $1325110 <br /> <br />A-7 <br />