Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />119~ <br />AMITV MUTUAL IRRIGATION COMPANY <br /> <br />DESCRIPTION OF WORK AND COST ESTIMATE <br /> <br />COMANCHE CANAL <br /> <br />1, Comanche Drop Structures <br /> <br />Repair and patch structures; add erosion protection <br />as needed; replace portions of several structures. <br /> <br />a. Drops A and B <br /> FOUNDATION PREPARATION 480 CY @ $9,00 $ 4320 <br /> REPAIR AND PATCH 20 CY @ $450 $ 9000 <br /> EROSION PROTECTION 2 EA @ $2500 $ 5000 <br /> ------- <br /> Subtotal: $ 18320 <br />b, Drop C <br /> STRUCTURAL CONCRETE 15 CY @ $325 $ 4875 <br /> EROS ION PROTECTION 1 EA @ $1500 $ 1500 <br /> ------- <br /> Subtotal: $ 6375 <br />c. Drop D <br /> EROSION PROTECTION 1 EA @ $1500 $ 1500 <br /> ------- <br /> Subtotal: $ 1500 <br />d. Drop E <br /> REPAIR AND PATCH 10 CY @ $450 $ 4500 <br /> EROS ION PROTECTION 1 EA @ $3000 $ 3000 <br /> ------- <br /> Subtotal: $ 7500 <br />e. Drop F <br /> REPAIR AND PATCH 10 CY @ $450 $ 4500 <br /> EROSION PROTECTI ON 1 EA @ $3000 $ 3000 <br /> ------- <br /> Subtotal: $ 7500 <br />f, Drop G <br /> REPAIR AND PATCH 8 CY @ $450 $ 3600 <br /> EROSION PROTECTION 1 EA I~ $3000 $ 3000 <br /> ------- <br /> Subtotal: $ 6600 <br /> A-8 <br />