Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1188 <br /> <br />AMITY MUTUAL <br /> <br />IRRIGATION COMPANY <br /> <br />DESCRIPTION OF WORK AND COST ESTIMATE <br /> <br />AM I TY CANALfContinuedl <br /> <br />14. Paul's Arroyo Cross DrainCmile 64.8) <br /> <br />Repair and patch structure, <br /> <br />REPAIR AND PATCH <br /> <br />20 CY @ $450 <br /> <br />$ 9000 <br /> <br />Subtotal for Paul's Arroyo Cross Drain: <br /> <br />$ <br /> <br />9000 <br /> <br />15. Wild Horse Creek Wasteway and CheckCmile 69,31 <br /> <br />Repair and patch check; replace wasteway superstructure; <br />replace gates; add erosion protection. <br /> <br />REPAIR AND PATCH 20 CY @ $450 $ 9000 <br />REMOVE CONCRETE 1 EA @ $10000 $ 10000 <br />STRUCTURAL CONCF:ETE 80 CY @ $325 $ 26000 <br />NEW GATES AND HDI STS 7 EA @ $2600 $ 18200 <br />EXCAVATION 50 CY @ $3.50 $ 175 <br />COMPACTED BACKFILL 50 CY @ $7.00 $ 350 <br />NEW GATES AND HOISTS 5 EA @ $7000 $ 35000 <br />EROSION PROTECTION 1 EA @ $5000 $ 5000 <br /> <br />Subtotal for Wild Horse Creek Wasteway and Check: <br /> <br />$ 103725 <br /> <br />16. East Horse Creek Cross DrainCmile 74.9) <br /> <br />Repair and patch structure. <br /> <br />REPAIR AND PATCH <br /> <br />30 CY @ $450 <br /> <br />$ 13500 <br /> <br />Subtotal for East Horse Creek Cross Drain: <br /> <br />$ 13500 <br /> <br />17. Hutchinson Drop StructureCapprox. mile 79) <br /> <br />Replace structure. <br /> <br />REMOVE CONCRETE 1 EA @ $6000 $ 6000 <br />EXCAVATION 50 CY @ $3.50 $ 175 <br />COMPACTED BACKFILL 40 CY @ $7.00 $ 280 <br />STRUCTURAL CONCRETE 80 CY @ $325 $ 26000 <br />EROSION PROTECTION 1 EA @ $2000 $ 2000 <br /> ------- <br /> <br />Subtotal for Hutchinson Drop Structure: <br /> <br />$ 34455 <br /> <br />A-6 <br />