Laserfiche WebLink
<br />Subtotal for Buffalo Creek Wasteway and Cross Drain: <br /> <br />$ 88750 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />.t!' ,: <br /> <br />AMITY MUTUAL <br /> <br />IRRIGATION COMPANY <br /> <br />DESCRIPTION OF WORK AND COST ESTIMATE <br /> <br />AM I TV CANALlContinuodl <br /> <br />10. Tarman Drop Structurelapprox, mile 361 <br /> <br />Repair and patch concrete , add erosion protection. <br /> <br /> REPAIR AND PATCH 5 CY @ $450 $ 2250 <br /> EROSION PROTECTION 1 EA @ $2000 $ 2000 <br /> ------- <br /> Subtotal for Tarman Drop Structure: $ 4250 <br />11. Parrish Drop Structureslmiles 41. 3 and 42.71 <br /> Replace both structur-es; add erosion protection. <br /> REMOVE CONCRETE 2 EA @ $5000 $ 10000 <br /> EXCAVATION 50 CY @ $3.50 $ 175 <br /> COMPACTED BACKFILL 50 CY @ $7.00 $ 350 <br /> STRUCTURAL CONCRETE 160 CY @ $325 $ 52000 <br /> EROS ION PROTECTION 2 EA @ $5000 $ 10000 <br /> ------- <br /> Subtotal for Parrish Drop Structures: $ 72525 <br /> <br />12. Buffalo Creek Wasteway and Cross Drainlmile 50.01 <br /> <br />Repair and patch structure; replace gates; <br />remove silt from Buffalo Creek, <br /> <br />REPAIR AND PATCH <br />NEW GATES AND HOISTS <br />EXCAVATION <br /> <br />75 CY @ $450 <br />5 EA ';! $7500 <br />5000 CY II! $3.50 <br /> <br />$ 33750 <br />$ 37500 <br />$ 17500 <br /> <br />13. Check Structures Nos, 1; 2 & 3lapprox. miles 51; 56 & 5al <br /> <br />Replace three structures and gates. <br /> <br />REMOVE CONCRETE 3 EA @ $5000 $ 15000 <br />EXCAVATION 150 CY @ $3.50 $ 525 <br />COMPACTED BACkFILL 120 CY @ $7.00 $ 840 <br />STRUCTURAL CmlCRETE 120 CY ';! $325 $ 39000 <br />NEW GATES AND HOISTS ... EA @ $10000 $ 30000 <br />~ <br /> ------- <br />Subtotal for Check Structures Nos. 1; .., g~ 3: $ 85365 <br />~ <br /> <br />A-5 <br />