My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08870
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08870
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:58 PM
Creation date
10/12/2006 3:19:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/4/1980
Author
PSIAC
Title
Minutes of the 80-2 Meeting - September 4-5 1980
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />003100 <br /> <br />WATERSHED OPERATIONS <br /> <br />ARIZONA: Buckhorn - Mesa Watershed <br /> <br />The design for the Signal Butte Floodway is being prepared <br />by the Montana design section and is approximately 75% <br />complete. Geological investigation for Signal Butte and <br />Pass Mountain flood retarding structures are compl ete. <br /> <br />Harquahala Valley Watershed <br /> <br />The start of construction of the Saddleback FRS and <br />Diversion will start in late September of 1980. The <br />final design for the Harquahala FRS will be completed by <br />September 1980 with construction starting in early summer <br />1981. The structure will be constructed concurrently with <br />Reach 5, of the Central Arizona Project. <br /> <br />Apache Junction - Gilbert Watershed <br /> <br />No change from last report. <br /> <br />William-Chandler Watershed <br /> <br />RWCD (Roosevelt Water Conservation District Floodway) <br /> <br />The contract for Reach 1 has been awarded for $2,904,180. <br />The design for Reach 2 is approximately 75% complete. <br /> <br />CALIFORNIA: Carpinteria Valley Watershed (Hog Canyon Diversion) <br /> <br />Supplement by exchange of correspondnece is complete. <br /> <br />BeardsleY Watershed <br /> <br />Work on this supplement was stopped short of completion. <br />No further construction work will be done on this project <br />until a decision is reached for Point Mugu outlet in <br />Revolon Watershed. <br /> <br />Revolon Watershed <br /> <br />A prescoping meeting held with the U.S. Army Corps of <br />Engineers, Navy, CALTRANS, and Ventura County Flood Control <br />indicates that studies needed to answer concerns are more <br />extensive than originally thought. A schedule for doing <br />the studies needs to be revised. <br /> <br />C-31 <br /> <br />,.. 1. .' <br />
The URL can be used to link to this page
Your browser does not support the video tag.