My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08868
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08868
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:57 PM
Creation date
10/12/2006 3:19:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407
Description
Platte River Basin - River Basin General Publications
State
CO
Basin
South Platte
Water Division
1
Date
9/1/1982
Author
Corps of Engineers
Title
Six State High Plains-Ogallala Aquifer Regional Resources Study - Appendixes Part II - D and E
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />-. J i.. _ .;l <br />I U hs d 'f -') <br /> <br />PLAN COMPARISON <br /> <br />Although two plans are shown, Plan I and Plan II, they are one "basic" <br />plan for the transfer of water. Plan I furnishes 1.72 M,Ac-Ft yield from <br />a terminal facility for distribution, where Plan 2 furnishes 9.6 M,Ac-Ft <br />yield for distribution. These yields are subject to an estimated 10 <br />percent loss in the distribution system prior to reaching primary users. <br /> <br />Items <br /> <br />Lands <br /> <br />Sources <br /> <br />Water Transport System <br />Pumping Plants <br />R R Crossings <br />River Crossings <br />Highway Crossings: <br />Interstate <br />U.S. <br />State <br />Pipeline Crossings <br /> <br />Terminal Facility <br />(Estimated Pool <br />E lev 2900 MSL) <br /> <br />TABLE 10 <br /> <br />PLAN I AND PLAN II COMPARISON <br />Plan I <br /> <br />Plan II <br /> <br />193,000 Ac <br /> <br />534,000 Ac <br /> <br />2 sites <br />(Naples, Bodcau) <br /> <br />6 sites <br />(Oes Arc, Saline, Tulip, <br />Bodcau, Carthage, Naples) <br /> <br />565 mi/channel <br />21* <br />21 <br />1 <br /> <br />3 <br />28 <br />43 <br />30 <br /> <br />845 mi/channel <br />30** <br />58 <br />2 <br /> <br />8 <br />68 <br />128 <br />83 <br /> <br />Storage Reservoir: <br />1,000,000 Ac-Ft,Storage <br />1,720,000 Ac-Ft, Yield <br /> <br />3,800,000 Ac-Ft, Storage <br />9,680,000 Ac-Ft, Yield <br /> <br />Estimated First Cost $3,180,000,000 $12,244,000,000 <br />Estimated Annual Cost $ 576,000,000 $ 2,680,000,000 <br />Estimated Energy Rate 7.5 BKWH/Yr 50 BKWH/Yr <br />* Pump Station lifts shown by reach on Figures 10, 11, 12. <br />** Pump Station lifts shown by reach on Figures 13, 14, 15. <br /> <br />021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.