My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08865
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08865
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:56 PM
Creation date
10/12/2006 3:19:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.B
Description
Colorado River-Water Projects-Glen Canyon Dam/Lake Powell-Glen Canyon Adaptive Management-TWG
Basin
Colorado Mainstem
Water Division
5
Date
6/10/2005
Title
Fiscal Year 2006-Monitoring and Research Work Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . , <br />, '. '~ ('. <br /> ~ <br />. <br /> 13 <br /> <br />new set ofMO's that resulted from its effort to develop an GCD-AMP strategic plan. The full <br /> <br />GCD- strategic plan was completed i,n FY 2002-03. <br /> <br />Revision Process <br /> <br />As part of the GCD-AMP strategic planning process, the INs were revised and approved <br /> <br />by the AMWG in August 2003. The approved MO's and INs are listed in APPENDIX B. <br /> <br />The monitoring and research activities proposed in the FY 2006 Work Plan are intended <br /> <br /> <br />to address the current management objectives and inforn1ation needs. The specific MO's <br /> <br />addressed by the monitoring and research activities proposed in this plan are listed in <br /> <br />APPENDIX B and referenced in the project descriptions. <br /> <br />GCMRC's PROPOSED SCIENTIFIC ACTIVITIES <br /> <br />The FY 2006 Work Plan describes monitoring and research activities that address the <br />management objectives (MO's) and information needs (INS)3 of the GCD-AMP to the extent <br />allowed under current ftpl'ding (see APPENDIX B). Projects described as provision with respect <br />to long-term monitoring (see column B of APPENDICES A and C), are designed to determine <br />changes in resource attributes. These science projects arc currently being rcviewed by external <br />experts on a technical basis, as well as being evaluated by the Technical Workgroup's Core- <br />Monitoring Plan ad hoc group (CMP) with respect to their appropriateness in meeting the <br />dcsignated information needs of the overall GCD-AMP. Research is used to improve <br />monitoring, interpret and explain trends observed from monitoring - most critically to determine <br />cause-and-effect relationships with dam operations (or other non-dam influences) and complex <br />resource interactions or associations, and to better define interrelationships among physical, <br />biological and social processes. The GCMRC is lead on the development of the Strategic <br />Science Implementation Plan (SSIP) and within that activity is also leading the way toward a <br />research plan, including a next-phase experimental design to follow the experimental work of <br />2003-2006, as well as development of a core-monitoring plan. <br />In addition, GCMRC has responsibility for management and dissemination of technical <br />information in the GCD-AMP program. Included, is development and maintenance of its <br />sophisticated Oracle database management system for archiving data collected as a result of <br /> <br />3 The MO's and the IN's are currently undergoing revision. This Work Plan references the draft revised MO's. The <br />fNs are being revised and they are not included in this document. <br /> <br />GCMRC FY2006 Annual Work Plan (Draft, June 10,2005) <br /> <br />e <br />I <br /> <br />i. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.