My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08865
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08865
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:56 PM
Creation date
10/12/2006 3:19:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.B
Description
Colorado River-Water Projects-Glen Canyon Dam/Lake Powell-Glen Canyon Adaptive Management-TWG
Basin
Colorado Mainstem
Water Division
5
Date
6/10/2005
Title
Fiscal Year 2006-Monitoring and Research Work Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,e <br />~, / <br /> <br />(. <br /> <br />". <br /> <br />~ <br /> <br />004'~9 <br /> <br />14 <br /> <br />monitoring and research activities, maintenance of a geographic infomlation system for analysis <br />and archiving of spatial data, and a library for additional archiving and data dissemination <br />activities. A major emphasis is placed on serving digital publications, data, and analytical tools <br />to our stakeholders and the public through the portal of the Southwest Biological Science <br />Center's GCMRC website (www.gcmrc.gov), GCMRC also operates a surveying department <br />designed to provide consistent, quality, cost-effective support to monitoring and research <br />projects. Finally, GCMRC operates a logistics prOt,'Tam to provide cost-effective support to <br />scientific field activities. <br />For additional details regarding individual program area overviews, as well as updated <br />information about the status of resources derived from the science progranl activities, please <br />refer to APPENDIX D. In addition, the GCMRC shall be distributing its report on the State of <br />the Colorado River Ecosystem (SCORE) report in fall 2005. This report will provide <br />information on the status and trends of resources of the Colorado River in response to the current <br />operating policy (1996 ROD). <br /> <br />OVERVIEW OF SCIENCE COORDINATION AND SUPPORT <br /> <br />Implementation oft~e GCMRC mission to provide credible, objective scientific <br /> <br />information to the GCD-AMP begins with effective coordination of all technical and logistical <br /> <br />support of research activities. The Research Coordination and Support Program staff functions as <br /> <br />a team to facilitate collaboration with the Integrated Science and Cultural Programs through <br /> <br />effective communication with Program Managers, PI's and the Technical Support Services. The <br /> <br />program encompasses the integration of 5 elements: <br /> <br />. Permitting <br />. Data Acquisition, Storage, Analysis (DASA), DBMS & Library Operations <br />. Survey Support Coordination <br />. DASA's GIS Technical Support Coordination <br />. Logistics Operations <br /> <br />Program Staff address each of these elements in assessment of support requests from <br />researchers to determine which tools and processes will best facilitate the most effective <br />collection and delivery of information from research projects. Through the combined effort of <br />,e the program elements the process of research support is executed as a complete and fully <br />integrated support service. The process is initiated in the proposal review and permitting stage, <br /> <br />GCMRC FY2006 Annual Work Plan (Drift, JUDe 10, 2005) <br />
The URL can be used to link to this page
Your browser does not support the video tag.