My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08852
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:54 PM
Creation date
10/12/2006 3:18:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8271.300
Description
Colorado River Basin Salinity Control Program - General Information and Publications-Reports
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1980
Title
Glenwood-Dotsero Springs Unit -- Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER IV <br /> <br />DESIGNS AND ESTIMATES <br /> <br />. <br /> <br />Role of the Water and Power Resources Service <br /> <br />Water and Power will continue as the lead agency for Phase II of the study. <br />~It will be the responsibility of the lead agency to, determine if, and to what <br />~ extent, a professional services contractor should be utilized for this phase. <br />,c:> If a contractor is not utilized, the agency will assume all of the respon- <br />sibilities outlined for the contractor previously. <br /> <br />Assuming tha~ a contractor is selected, Water and Power will provide him <br />a list of features, design and environmental data collection criteria, and de":, <br />sign standards. The agency will provide critical review of all reports, designs,' <br />and estimates submitted by the contractor. <br /> <br />Role of the Public <br /> <br />Aft,er the plan selection activities described in the,preceding cl1apter <br />are completed, the role of the public will become somewhat less active until <br />the feasibility report and environmental statement are, ready,for,p,ublic. rev:!-ew,. , <br />The public will be kept informed on the progress of the study by news letters <br />to be sent out during this phase as discussed in Chapter II. Any conunent or <br />opinion will be considered by the Water and Power and the planning team.' <br /> <br />. <br /> <br />. <br /> <br />17 <br /> <br />,. ,', " <br />
The URL can be used to link to this page
Your browser does not support the video tag.