My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08852
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:54 PM
Creation date
10/12/2006 3:18:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8271.300
Description
Colorado River Basin Salinity Control Program - General Information and Publications-Reports
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1980
Title
Glenwood-Dotsero Springs Unit -- Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />.~ <br /> <br />. <br /> <br />CHAPTER IV <br /> <br />~ <br />~ <br />C) <br />~ <br /> <br />DESIGNS AND ESTIMATES <br /> <br />Introduction <br /> <br />~~ <br /> <br />~.f <br /> <br />After completion of the Phase I plan formulation activities described in <br />the preceding chapter and, providing an acceptable plan(s) has been selected, <br />it will be necessary to collect design data and develop feasibility level de- <br />signs and cost e~timatesfor such plan(s). It will also be necessary to col- <br />lect site specific environmental data for use in preparing the unit environ- <br />mental statement, if it is determined that one is necessary. These activities <br />are referred to as Phase II of the study. <br /> <br />( -' ~ <br /> <br />Depending on the circumstances which develop during Phase I of the study, <br />the Water and Power Resources Service retains the option to discontinue the <br />use of a professional services contractor and do the work itself, to continue <br />the study with the same contractor who performed Phase I, or to select a dif- <br />ferent contractor with whom a separate contract would be executed. <br /> <br />Role of Professional Services Contractor <br /> <br />If it is determined to employ a contractor for Phase II, he will be respon- <br />sible for collecting hydrologic, geologic, and engineering data for designin~ <br />the proposed unit features. He will also be responsible for collecting the <br />site specific environmental data. All data collection will be performed accord- <br />ing to Water and Power standards and requirements and will be presented in <br />reports as established at the time the contract is negotiated. Prior to <br />establishing the Phase II requirements, it will be determined if it would be <br />to the advantage of Water and Power for the contractor to prepare the designs <br />and estimates for some or all of the features. A plan of study will be sub- <br />mitted to Water and Power for approval before the work commences. Reports, <br />designs, and drawings will be submitted as provided in the Contract. <br /> <br />Role of the Planning Team <br /> <br />Under Phase II, the planning team will continue to serve in an advisory <br />capacity to Water and Power and the p~ofessional services contractor. The <br />team members would continue to provide liaison between those entities and the <br />general public. Appropriate sub teams will assist in the collection of site <br />specific environmental data. The team or appropriate sub teams will review <br />reports or other submittals from the contractor as determined by Water and <br />Power. <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.