My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08737
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:28 PM
Creation date
10/12/2006 3:14:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
10/1/1963
Author
Water Development Co
Title
Review of Site Selection Criteria Narrows and Weld County Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />I <br />,. <br />. <br />I <br />. <br />. <br />. <br />. <br />I <br />. <br /> <br />that at the time the Weld County estimates were made there were no subsurface <br /> <br />investigations, and no topography except USGS sheets. Reconnaissance type <br /> <br />estimates have been made of the reservoir right-of-way costs for both pro- <br /> <br />jects. <br /> <br />Comparison of the total estimates indicates an economic advantage <br /> <br />of $7,000,000 in favor of the Narrows site. The USBR's studies indicate <br /> <br />that the Weld County site produces slightly greater irrigation benefits, <br /> <br />but not sufficient to justify the extra $7,000,000 of investment, <br /> <br />We reviewed the USBR cost estimates for both projects and found <br /> <br />them to be reasonable with the possible exception of the item of rights-of- <br /> <br />way costs., <br /> <br /> <br />The USBR site selection report of September 1961, page 9, states <br /> <br />that the cost estimate includes $6,520,000 for right-of-way acquisition <br /> <br />for the dam at the Narrows site. This includes purchase of 7,300 acres of <br /> <br />irrigated crop land and l,OOO acres of , meadow land. <br /> <br />This same report, page ll, states that for the Weld County Site <br /> <br />the estimate includes $5,450,000 for rights-of-way, including purchase of <br /> <br />3,200 acres of crop land and 6,700 acres of meadow land. A breakdown of <br /> <br />the right-of-way costs is as follows: <br /> <br />Estimated Total Cost of Right-Of-Way <br /> <br /> Narrows Weld County <br />For Reservoir. Areas $4,330,000 $4,360,000 <br />For R R & Highway 530,000 660,000 <br />For Flood Easement 840,000 430,000 <br />For Urban Property 820,000 0 <br /> Totals 6,520,000 5,450,000 <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.