Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />You will realize that it is not feasible in this short time to <br /> <br />check in detail all studies made over many years by several government <br /> <br />agencies and by your own staff. However, our review and discussions with <br /> <br />both your staff and the USBR, did reveal certain points which we believe <br /> <br />justify further study and which could possibly result in shifting of the <br />economic selection of site in favor of the Weld County location. These <br /> <br />points are discussed below. <br /> <br />Background Information <br /> <br />Findings and recommendations outlined in this report are based <br /> <br />on our inspection of the proposed Narrows and Weld County dam sites and <br /> <br />reservoir areas, discussions with members of the Water Development Committee <br /> <br />and USBR engineers, and review of the following: <br /> <br />USBR - Report on the Narrows Unit - Colorado, South Platte, <br /> <br />Division, Missouri River Basin Project - Part I, Status as <br /> <br />of October 1957. <br />USBR - Site Selection Report, Narrows Unit - Colorado, Missouri <br /> <br />River Basin Project, September 1961 <br /> <br />USBR - Site Selection Presentation to the South Platte Steering <br /> <br />Committee, February 1963 <br /> <br />Miscellaneous data furnished by the Water Development Committee <br /> <br />and USBR engineers. <br /> <br />Findings and Recommendations <br /> <br />a. Estimated Cost of Projects <br /> <br />The structural features of the Narrows Project have been estimated <br /> <br />in detail, based on project layouts and thorough subsurface investigations. <br /> <br />The Weld County project estimates are of approximately the same grade except <br /> <br /> <br />-3- <br />