My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08734
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08734
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:27 PM
Creation date
10/12/2006 3:14:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.430
Description
Colorado River Basin Organizations-Entities - Gunnison - UVWUA - AB Lateral
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/1/2000
Author
DOI
Title
AB Lateral Hydropower Project - Supplemental Environmental Impact Report - Appendix A - Wetlands Mitigation Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />n 0 1 7!) 6 Wetland Mitigation <br /> <br />A- 17 <br /> <br />Section II <br /> <br />1. <br /> <br />Proposed Uncompahgre River <br /> <br />Channel Monitoring Plan <br /> <br />Uncompahgre Valley Water Users Assn. <br />and Montrose Partners Ltd. <br /> <br />May, 2000 <br /> <br />A.4 Introduction <br /> <br />As part of the 404 permit and SEIR consultation process, the Corps of Engineers <br />requested that a channel monitoring plan be submitted as a potential prerequisite to <br />permit issuance for the AB Lateral Hydropower Facility. The Sponsors understand that <br />the underlying goal of the plan should be to detect and identify systematic changes in the <br />channel associated with project flows, and ultimately compare actual channel responses <br />to predictions. Based upon this goal, and further guidance provided by the Corps, the <br />Sponsors propose a plan that includes the following components: <br /> <br />. Ground-level transects and monitoring stations; <br />. Groundwater monitoring wells at selected wetland mitigation sites <br />. Aerial photography; <br />. Temperature/ice monitoring; and <br />. Reporting. <br /> <br />The following discussion presents details. <br /> <br />A.S <br /> <br />Ground-Level Transects and Monitoring Stations <br /> <br />A.5.1 <br /> <br />Number and Location. <br /> <br />A series of monitoring cross-sections would be established along the Uncompahgre River <br />between the AB Lateral outfall and the Gunnison River. Monitoring locations would <br />include: <br /> <br />i) the 22 "Monitor" sites identified in the 404 Application, and <br />ii) 10 additional relatively straight channeI.sections. <br /> <br />MEI has recommended that emphasis be placed on results from straight reaches, where <br />significant (non-project) bank erosion would not be expected. At such sites, lateral <br /> <br /><: <br /> <br />AB Lateral Hydropower Project <br /> <br />July 2000 <br /> <br />1 <br />'1 <br />. <br />1.....11 <br />. ... ,t::'1 <br />,10 ,~.,'d"__,i;j,;<;i,, :Ei'JiI <br /> <br />L- <br /> <br />-'>". ",'"' <br />
The URL can be used to link to this page
Your browser does not support the video tag.