My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08607
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08607
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:55 PM
Creation date
10/12/2006 3:07:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.660
Description
Miscellaneous Small Projects and Project Studies - Highland Breaks Watershed
State
CO
Basin
Arkansas
Water Division
2
Date
9/1/1998
Author
USDA NRCS
Title
Highland Breaks Watershed - PL 83-566 Watershed Plan - Environmental Assessment
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />total financial assistance to be received does not exceed 100 percent of the cost. If <br />" - f other 1.Rldera.1 funds are used, the NRCS share will be reduced by the amount of the <br />00245 other 1Rlderal funding. <br /> <br />. . . <br /> <br />, ~~ . . . <br />The basis for each LTC will be a conservation plan of operations (CPOs) that will detail <br /> <br />the kind, amount, location. and installation schedule of the planned practices. CPOs <br /> <br />will be reviewed and approved by the SCDs prior to finalization of the contract between <br /> <br />NRCS and the participant. <br /> <br />Primary considerations in establishing the installation schedule include: the seasonal <br /> <br />nature of the practices.i' the inter-relationship of practices.i' the availability of contractors <br /> <br />and mate,ials.i' the landowners' financial situation.i' and the need for and availability of <br /> <br />technical services. These considerations will provide land users the maximum time <br /> <br />possible to finance their share of the project installation cost. <br /> <br />Each contract may range in length from 3 to 10 years. All cost-share practices must be <br /> <br /> <br />installed 2twG years before the end of the contract, to allow 2twG years of management, <br /> <br />operation and maintenance. The installation schedule will include the necessary <br /> <br />management practices. <br /> <br />L TCs will be approved by NRCS and the SCDs. All LTC's must be signed within 5 <br /> <br />years of the date the watershed plan is approved. Contracts can be modified or revised <br /> <br />as long as project objectives, as identified in the watershed plan are achieved. <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.