Laserfiche WebLink
<br />002'4' <br /> <br />Authorized improvement areas are more particularly identified as follows: <br /> <br />Cross Creek diversion <br />West Cross Creek diverison <br />Fall Creek diversion <br />East Cross Creek diversion <br /> <br />0.85 acres <br />0.15 acres <br />0.35 acres <br />0.20 acres <br /> <br />Subtotal surface occupied <br />within Holy Cross Wilderness <br /> <br />1. 55 acres <br /> <br />Fancy Creek tunnel portal <br />Fancy Creek access road (1,200 feet long) <br />Pipelines: Fancy Creek to Missouri Creek -- <br />66" diameter pipeline; 3,400 feet long <br />72" diameter pipeline; 800 feet long <br /> <br />Subtotal surface occupied <br />outside Wilderness <br /> <br />Total surface occupied <br /> <br />0.05 acres <br />1. 40 acres <br /> <br />3.90 acres <br />0.90 acres <br /> <br />6.25 acres <br />7.80 acres <br /> <br />Subsurface improvements are the following tunnels, which have a lO-foot <br />diameter bore: <br /> <br />Beneath Holy Cross Wilderness <br />East Cross Creek Tunnel <br />Fall Creek Tunnel <br />Cross Creek Tunnel <br /> <br />9,303 feet <br />17,178 feet <br />19,070 feet <br /> <br />Subtotal of tunnels beneath <br />Holy Cross Wilderness <br /> <br />Beneath non-Wilderness land -- <br />Cross Creek Tunnel <br /> <br />Subtotal subsurface occupied <br /> <br />45,551 feet or 10.46 acres <br /> <br />11,600 feet or 2.66 acres <br />13.12 acres <br /> <br />Total of all surface and subsurface occupied <br /> <br />20.92 acres <br /> <br />Upon completion of construction, however, the Grantee shall furnish the <br />Forest Service with four sets of "as constructed" location plats. This <br />easement will then be revised as deemed necessary by the Regional Forester <br />to authorize the continued occupancy and maintenance of the rights-of-way <br />as constructed. ' <br /> <br />2 <br />