Laserfiche WebLink
<br />. ' <br /> <br />;~(:~:i; D . <br />.-;~..;.. <br /> <br />w <br />c.:u <br />o <br />to <br /> <br />:.~:>~;l <br /> <br />Priority Areas and Prioritization <br /> <br />1. Criteria for rating priority areas within the Lower Gunnison <br />#3 Project Area is based on the salt load measured from <br />certain locations within these watersheds. Each watershed is <br />given a point rating factor based on the salt loading <br />measurements with the highest receiving the most points. See <br />attachment 3 rating factors. <br /> <br />2. Rating factors. (See attachment #3) <br /> <br />a. Type of project, group or individual. <br />b. Priority area of work. <br /> <br />c. Scope of work to be done. <br /> <br />d. Schedule of application for work ,to. be completed. <br /> <br />e. Extent of needed Salinity Control work completed under <br />other programs. <br /> <br />f. Coordination with another project. <br /> <br />g. Signup period. <br /> <br />E. Monitoring and Evaluation (M&E) <br /> <br />Objectives of the Monitoring and Evaluation are: <br /> <br />1. To quantify through a data gathering and evaluation activity <br />the salt load reduction attributable to improved irrigation water <br />management. <br /> <br />2. To provide farmers with improved technical assistance for <br />achieving irrigation water management. <br /> <br />3. To evaluate changes in wetland and wildlife habitat resulting <br />from improved irrigation systems and irrigation water management. <br /> <br />4. To determine local economic impacts of this salinity project. <br /> <br />5. To determine changes that should be made in the project to <br />achieve salinity control objectives. <br /> <br />3 <br />