Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />o <br />w <br />(D <br />~ <br /> <br />SUMMARY SHEETS (Continued) <br /> <br />the well field would be pumped through a collector pipe to a central <br /> <br />regulating reservoir and then into a buried pipeline which would extend <br /> <br />south to another regulating reservoir. From this point, separate buried <br /> <br />pieplines would extend southeast to the proposed Chevron plant and <br /> <br />southwest to the existing Texasgulf plant. In addition, measures would <br /> <br />be taken to mitigate environmental losses. <br /> <br />The unit constructed features would be operated and administered by the <br /> <br />State of Wyoming. <br /> <br />EFFECTS ON THE COLORADO RIVER (average annual) <br /> <br />Decrease in salt load (tons) <br />Depletion (acre-feet) <br />Reduction in salinity at Imperial Dam (mg/L) <br /> <br />77 , 300 <br />18,700 <br />7.8 <br /> <br />PROJECT FEATURE <br /> <br />Collector wells (number) <br />Pipelines (miles) <br />Regulating reservoirs (number) <br />Pumping plants (number) <br />Access roads (miles) <br />Transmission lines (miles) <br /> <br />26 <br />67 <br />7 <br />5 <br />13.5 <br />43.5 <br /> <br />5-2 <br />