Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />o <br />w <br />c.o <br />tv <br /> <br />SUMMARY SHEETS (Continued) <br /> <br />ESTIMATED COSTS <br /> <br />Construction costs (January 1983 levels) <br />Collector wells <br />Pipelines <br />Transmission lines <br />Permanent operating facilities <br />Revegetation of disturbed areas <br />Aquatic resources protection <br />Cultural resources mitigation <br />Total <br />Less cost of investigations prior to authorizatio~1 <br />Interest during construction <br />(4 years at 8 1/8 percent) <br />Total investment <br />Annual equivalent costs <br />Construction costs (amortized over 100 years <br />at 8 1/8 percent) <br />Annual operation, maintenance, and replacement <br />Total <br />Cost per mglL of salinity reduction at Imperial Dam <br /> <br />$4,630,000 <br />36,400,000 <br />2,200,000 <br />500,000 <br />400,000 <br />170,000 <br />110,000 <br />44,410,000 <br />-1,904,000 <br /> <br />5,863,000 <br />48,369,000 <br /> <br />3,932,000 <br />1,763,OQO <br />5,695,000 <br />730,000 <br /> <br />COST ALLOCATION <br /> <br />Operation, <br />maintenance <br />and replace- <br />ment costs <br />$888,000 <br /> <br />Reimbursable costs <br />Nonreimbursable costs <br />Total costs allocated <br />'::..1 As specified in <br />prior to authorization are <br />allocations. <br /> <br />Construction <br />$13,926,000 <br />28,580,000 <br />42,506,000 888,000 <br />Public Law 92-149, costs of investigations <br />nonreimbursable but are not included in the <br /> <br />REPAYMENT OF REIMBURSABLE CONSTRUCTION COSTS <br /> <br />Construction <br />$4,400,000 <br />1,429,000 <br />8,097,000 <br />13,926,000 <br /> <br />State of Wyoming <br />Upper Colorado River Basin Fund <br />Lower Colorado River Basin Development Fund <br />Total <br /> <br />5-3 <br />