My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_3539100
DWR
>
Division Filing
>
2019
>
12
>
DWR_3539100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 9:50:38 AM
Creation date
12/6/2019 3:32:24 PM
Metadata
Fields
Template:
Division Filing
Document Date
12/6/2019
Document Type - Division Filing
Report/Study
Division
2
WDID
1707701
Subject
PILOT PROJECT - COLORADO SPRINGS UTILITIES SUPER DITCH HB1248 STATE ENGINEERS DETERMINATION
DWR Send/Recipient
KEVIN REIN, STATE ENGINEER
Outside Send/Recipient
ALEX FUNK, CWCB, COLORADO SPRINGS UTILITIES, SUPER DITCH
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Springs/Super Ditch Pilot Project ' State Engineer's Determination <br />December 6'2O1V <br />Page gof15 <br />of the Consumptive Use Water and then exchanges fully consumable return flows from that first <br />use mrsubsequent uses. <br />26�Appiicants may operate an exchange only if there is a continuous live stream between the <br />downstream exchange -from point and the upstream exchange -to point, and must cease <br />operating at anytime that a live stream ceases to exist in that reach. <br />27,The rate and volume of water diverted at the exchange -to point prstepped exchange points <br />shall not be greater than the rate and volume of water introduced at the exchange -from point, <br />after adjustment as necessary to account for losses (including but not limited Lmtransit losses, <br />seepage losses, evaporation, and evapotranspiration). <br />28. The rate of exchange shall be limited to the least of (1) the rate at which substitute supplies <br />are delivered at the exchange -from point, (2) the rate at which the exchange is in priority <br />within the relevant exchange reach, (3) the minimum rate of flow in the exchange reach that <br />will preserve a live stream, (4) the amount of flow available at the exchange -to point, and (5) <br />the physical capacity of the receiving structure at the exchange -to point that is legally <br />available toApplicants. <br />29. Stored water derived from the Pilot Project and/or fully consumable sources available toCS-U <br />will be used to meet the tagged historical return flow obligations associated with the fallowing <br />of the historically irrigated lands. Transit losses on water delivered for replacement of the <br />tagged historical return flow obligations as assessed by the Division Engineer will be included <br />from the point of release to the confluence of the Arkansas River and Crooked Arroyo orTimpao <br />Creek, as applicable. <br />30� Any return flows not met by delivery of that portion of the available headgatediversions shall <br />be made up from some other source decreed for this use or approved for this use by a <br />substitute water supply plan, or from the consumptive yield of shares included in the Pilot <br />Project. <br />31.4K diversions shall be measured in a manner acceptable to the Division Engineer. Super Ditch <br />shall install and maintain measuring devices as required by the Division Engineer for operation <br />of the Pilot Project. <br />32. Accounting: Accounting of water in this Pilot Project must be provided to the Division Engineer <br />on forms and at times acceptable to him or her. Said accounting must be received by the iOLh <br />of the month following the month being reported. <br />33. The accounting will use the amounts described in this Determination tocalculate consumptive <br />use volumes and return flow obligations. <br />34.The name, e-mail and postal addresses, and phone number of the contact person who will be <br />responsible for the operation and accounting of the Pilot Project must be provided with the <br />accounting forms to the Division Engineer and Water Commissioner through the email listed in <br />condition no. 3. <br />35� Fryingpan-Arkansas Project facilities: Pueblo Reservoir' Twin Lakes Reservoir and Fountain <br />Valley Pipeline (or Conduit) are owned and operated as part pfthe Fryingpan'Arkansas Project <br />by the United States Department of the Interior, Bureau of Reclamation. Applicants shall store <br />water in Pueblo Reservoir only ou long as they have a contract with the owners of that <br />structure, and such storage and use iswithin the effective time period mfsuch contract. Any <br />use ofFryingpan-Arkansas Project facilities by Applicants, for storage, exchange orotherwise, <br />will occur only with the written permission of the owner of said reservoir, and will be made <br />consistent with such policies, procedures, contracts, charges, and terms as may Lawfully be <br />determined by the U.S. Bureau of Reclamation or its successors in interest, intheir good faith <br />discretion. Any approval of the Pilot Project will not give Applicants any rights to use of <br />Fryingpan -Arkansas Project structures, including Pueblo Reservoir' but will not alter any <br />
The URL can be used to link to this page
Your browser does not support the video tag.