Laserfiche WebLink
Colorado Springs/Super Ditch Pilot Project ' State Engineer's Determination <br />December 6'2O1V <br />Page 8of15 <br />19,The amount of consumptive use credits and return flow obligations and the disposition of <br />consumptive use credit and return flow replacement water shall be calculated on a daily basis. <br />Such consumptive use credits may be exchanged to Pueblo Reservoir for use bvCS-U or to <br />replace Pilot Project return flows as necessary, or step exchanged` to storage for such uses. <br />Water allocated to replace deep percolation return flows and delivered through Catlin Canal <br />augmentation stations that is in excess of the replacement requirement on a given day may be <br />exchanged to Pueblo Reservoir to replace Pilot Project return flows as necessary, or step <br />exchanged to storage for such uses on the day the excess return flow is delivered to the <br />Arkansas River. Excess deep percolation return flow water exchanged to Pueblo Reservoir for <br />this purpose shall be accounted for separately from the consumptive use water. (see also <br />conditionB12) <br />20. Consumptive use credits available from Pilot Project operations may only be used for the <br />purpose requested in the application, municipal use by Colorado Springs or to replace return <br />flows owed due to Pilot Project operation. <br />21. Calculations of return flows owed to the river must be updated as needed (at least monthly), <br />based on actual past water availability and estimated future availability. If there is an under <br />delivery of return flow water in any month this under delivery yhniL be made up in the <br />subsequent month. <br />21 Exchanges: Exchange into Pueblo Reservoir may occur only when there is at least 100cfs of <br />outflow (inclusive of hatchery flows) from Pueblo Reservoir. Such dive oions/exchanges may <br />not cause the outflow from Pueblo Reservoir to be less than 100cfs, In addition' exchanges <br />will be operated as junior to the City of PuebLo's recreational in -channel diversion water right <br />awarded in Case No. 01CVY180, and as though the right is in effect 24 hours per day. <br />Operations of this Pilot Project shall comply with the requirements of the Arkansas River Flow <br />Management Program (the "R0P") established pursuant to the May 2004 Regional <br />Intergovernmental Agreement among Pueblo, the City of Aurora, Colorado, acting by and <br />through its Utility Enterprise, Southeastern, Fountain, CS'U, and Pueblo Water (the ''|G4"), to <br />the same extent that CS-U and Southeastern are required to comply with the RNP, which may <br />result in additional limitations on the exchange of water into Pueblo Reservoir. <br />Notwithstanding the foregoing, this term and condition does not require Super Ditch tncomply <br />with any terms and conditions in the |GA that are not specifically listed in the RMP. <br />23. No exchange will be operated under this Pilot Project past the Avondale gauge when flows at <br />the USGS Gauge at Avondale are, or to the extent such exchanges will cause such flows at the <br />Avondale Gauge to be, less than 500cfs. <br />24.4ny exchange of water as a part of this Pilot Project must be approved in advance by the <br />Division Engineer after a determination that there is sufficient exchange potential to <br />accomplish the requested exchange without injury to other water rights. Applicants must <br />request to make an exchange through the Arkansas River Dashboard. If the Dashboard is not <br />functioning property, Applicants must request to make an exchange via an email to <br />DNR_R0P@state.co.us. <br />25�Exchanges operated under the decree for Case No. 10[VY04 will comply with all terms and <br />conditions decreed therein. Any exchange operated in connection with this Pilot Project under <br />Administrative Approval will comply with all relevant terms and conditions for the Pilot <br />Project. No exchanges into Pueblo Reservoir will be operated under the exchanges decreed in <br />Case No. 85CVY96 under this Pilot Project except to the extent that CS-U has made a first use <br />/ Stored in an intermediate storage location prior to final exchange to Pueblo Reservoir during periods <br />