My WebLink
|
Help
|
About
|
Sign Out
Home
Search
DWR_2731751
DWR
>
Dam Safety
>
2015
>
04
>
DWR_2731751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 2:06:54 PM
Creation date
4/6/2015 1:05:16 PM
Metadata
Fields
Template:
Dam Safety
Document Date
12/18/2014
Document Type - Dam Safety
Report
Division
1
Dam ID
020615
Subject
HAVANA STREET DAM - SEPT. 2013 DAM FAILURE FORENSIC INVESTIGATION
DWR Send/Recipient
DAM SAFETY BRANCH - COLORADO DIVISION OF WATER RESOURCES
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 6 - Pumps Deployed to Draw Down Storage Impounded by Abandoned Railroad <br />Embankment. Source: RMA, 2013 <br />6.0 Field Investigation <br />The team described above collected onsite survey data during a single 2 hour site visit. A <br />summary of the raw data including photographs, gps coordinates, breach cross sections, high <br />water marks, downstream cross sections are illustrated in Appendices C &t D. <br />A high -level reconnaissance of the drainage basin immediately downstream of Havana Street <br />Dam was performed after the survey of the dam was complete. The main damage appeared <br />to be to the Havana Street road embankment approximately 1/a mile downstream of the dam. <br />The overtopping had resulted in some erosion of the downstream shoulder of the embankment <br />undermining a significant portion of the asphalt surfacing as shown in Figure 7 below. <br />Figure 7 - Overtopping Damage of Havana Street. <br />
The URL can be used to link to this page
Your browser does not support the video tag.