My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_2726118
DWR
>
Dam Safety
>
2015
>
03
>
DWR_2726118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2016 1:23:08 PM
Creation date
3/25/2015 9:45:01 AM
Metadata
Fields
Template:
Dam Safety
Document Date
1/23/2015
Document Type - Dam Safety
Report
Division
2
Dam ID
100469
Subject
UPPER EMERALD VALLEY RANCH DAM - FINAL DAM FAILURE FORENSIC INVESTIGATION REPORT
DWR Send/Recipient
JOHN HUNYADI, BILL McCORMICK - DSB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 23 Upper and Lower Emerald Valley Dam Failure Report <br /> January 23, 2015 <br /> <br /> Figure 29: Schematic Profile View of Keeton Access Bridge <br />To estimate the flow that could pass beneath the bridge chord, the software program <br />Bentley Flowmaster was utilized. Inputs for channel slope and bridge chord elevation <br />were known and a Mannings n, roughness coefficient, of 0.105 was utilized. It is <br />estimated the bridge can pass about 506 cfs below the bridge chord, as shown below. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Figure 30: Flowmaster estimate of Channel capacity <br />BELOW bridge Chord <br />Figure 31: RR Tie Bridge Channel Capacity, below bridge chord
The URL can be used to link to this page
Your browser does not support the video tag.