Laserfiche WebLink
CARRIAGE HILLS NO. 2 DAM, Dam Failure Forensic Investigation Report Page 38  <br />February 27, 2015  <br />  <br />  <br />Photo 21:  Debris in Fish Creek Arm of Lake Estes at 06:44 hrs, Sept. 13, 2013 (source: USBR)  <br />  <br />  <br />Photo 22: Flood debris inside of a building at Camp Cheley, located on an unnamed tributary of Fish Creek north  <br />of the Twin Sisters Peaks and around 2 miles south (upstream) of the Carriage Hills dams.  This flood damage  <br />reportedly occurred sometime after midnight on Sept. 13th (SEO Dam Safety Branch photo).