My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_2717593
DWR
>
Dam Safety
>
2015
>
03
>
DWR_2717593
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2017 11:09:13 AM
Creation date
3/3/2015 11:31:22 AM
Metadata
Fields
Template:
Dam Safety
Document Date
2/27/2015
Document Type - Dam Safety
Report
Division
5
Dam ID
040110
Subject
CARRIAGE HILLS #2 (LOWER) DAM - FAILURE FORENSIC REPORT REVISED
DWR Send/Recipient
DSB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CARRIAGE HILLS NO. 2 DAM, Dam Failure Forensic Investigation Report Page 38 <br />February 27, 2015 <br /> <br /> <br />Photo 21: Debris in Fish Creek Arm of Lake Estes at 06:44 hrs, Sept. 13, 2013 (source: USBR) <br /> <br /> <br />Photo 22: Flood debris inside of a building at Camp Cheley, located on an unnamed tributary of Fish Creek north <br />of the Twin Sisters Peaks and around 2 miles south (upstream) of the Carriage Hills dams. This flood damage <br />reportedly occurred sometime after midnight on Sept. 13th (SEO Dam Safety Branch photo).
The URL can be used to link to this page
Your browser does not support the video tag.