Laserfiche WebLink
CARRIAGE HILLS NO. 2 DAM, Dam Failure Forensic Investigation Report Page 20  <br />February 27, 2015  <br />  <br />Figure 13:  FHWA HY8 summary output for Colorado Highway 7  5’x7’ box culvert.  <br />  <br />7.2.2 CROSS‐SECTION 1, Bike path and three 15‐inch culverts:  Cross section 1 is at the bike path crossing over  <br />the CH North Trib, immediately downstream of CO HWY 7.  We surveyed the bike path profile for overtopping  <br />analysis and the three 15‐inch HDPE culverts through the embankment.  We surveyed a high water mark at  <br />approximately 0.9 ft above the low point in the bike path.  This gives reasonable agreement with a resident’s  <br />account of about ½‐ft of water flowing over the bike path during the flood (see Section 5). Again using FHWA’s  <br />HY8 we calculated:  Peak flow=151 cfs at the surveyed high water elevation 99.24 (assumed survey datum).  A  <br />sketch of the culverts and summary results from HY8 are shown in Figures 14 & 15.    <br />  <br />Figure 14:  Surveyed bike path and three 15‐inch diameter HDPE culverts.   Surveyed elevations for the bike path profile are  <br />not shown.