Laserfiche WebLink
CARRIAGE HILLS NO. 2 DAM, Dam Failure Forensic Investigation Report Page 16  <br />February 27, 2015  <br />  <br />   Table 3:  September 8‐17, 2013, Rain Totals (depth and volume)  <br />Subbasin Area (sq. mi.) Total Rain Depth  <br />(inch)  <br />Total Rain Volume  <br />(acre‐feet)  <br />1 0.80 9.6 411 <br />2 1.55 9.6 792 <br />3 0.24 10.1 128 <br />4 0.12 10.4 66 <br />5 0.91 10.4 505 <br />6 0.11 10.7 66 <br />7 10.23 13.9 7,593 <br />8 1.49 11.1 882 <br />9 0.16 10.4 87 <br />Total 15.60 12.7 10,560 <br />  <br />7.1.2 Temporal Rain Data:   AWA reported rain time series in Coordinated Universal Time (UTC); the DSB  <br />subsequently converted all times to Mountain Daylight Time (MDT), local time at the time of the flood, for this  <br />study.  According to the AWA data, adjusted to MDT, rain began on the afternoon of Sept. 8, 2013 (Sunday).  The  <br />first inch of rain slowly accumulated on the Fish Creek basin by Sept. 11, 2013 (Wednesday) at 00:50 hrs.   The  <br />second inch of rain had fallen by Sept. 11, 21:10 hrs.  The largest amount of rain (approximately 9.3 inches  <br />averaged over the entire basin) fell between Sept. 11, 21:10 hrs and Sept. 13, 00:00 hrs (see Figure 8).  A small  <br />rain event followed on Sept. 15th.    <br />  <br />  <br />Figure 8:   Temporal mass curves corresponding to selected Fish Creek subbasins  <br />  <br />9/11/13, 21:10 ‐ 9/12/13 04:00  <br />9/12/13, 22:00‐9/13/13 00:00  <br />9/12/13, 06:00‐14:00