My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_3992986
DWR
>
Rulemaking
>
2022
>
11
>
DWR_3992986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2024 3:36:39 PM
Creation date
11/4/2022 9:52:18 AM
Metadata
Fields
Template:
Rulemaking
Rule Name
Division 6 Measurement Rules
Document Type - Rulemaking
Final Actions
Subject
State Engineer's Statement of Basis and Purpose for Rules and Regulations Governing Measurement of Surface Water and Groundwater Diversions and Storage, Release and Delivery of Water Located in Water Division 6
Date Effective
1/16/2024
Year Initiated
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rule 10: Noncompliance <br /> Rule 10 addresses enforcement for noncompliance with the Rules. <br /> Rule 11: Variance <br /> Rule 11 describes the process by which the Division Engineer may grant a variance to <br /> these Rules when the strict application of these Rules presents practical difficulties or may cause <br /> undue hardship. Any request for a variance shall be made to the Division Engineer and will be <br /> granted or denied at the sole discretion of the Division Engineer. The Division Engineer may <br /> impose any additional terms and conditions to a variance as are necessary in accordance with the <br /> Rules. <br /> Rule 12: Effect of Rules <br /> Rule 12 states that these Rules do not exempt any Water User from any other <br /> requirements of any other laws, rules, or water court decrees. <br /> Rule 13: Process to Appeal a Decision to the State Engineer under these Rules <br /> Rule 13 describes the process to appeal a decision made under the Rules to the State <br /> Engineer. Appeals to the State Engineer will proceed in accordance with the State Engineer's <br /> Procedural Rules, 2 CCR 402-5. The intent of Rule 13 is to provide a timely and less expensive <br /> alternative to a person adversely affected by a decision of the Division Engineer under these <br /> Rules. Any final determinations by the State Engineer are subject to judicial review under the <br /> State Administrative Procedures Act. <br /> Rule 14: Severability <br /> Rule 14 explains that if any rule, or part of a rule, is found to be invalid, the remaining <br /> rules remain in full force and effect. <br /> Rule 15: Revisions <br /> Rule 15 explains that the Rules may be revised in accordance with applicable law. <br /> Rule 16: Statement of Basis and Purpose Incorporated by Reference <br /> Rule 16 incorporates this Statement of Basis and Purpose as part of the Rules. <br /> Rule 17: Phase In <br /> To allow Water Users sufficient time to acquire and install Headgates, Measuring <br /> Devices, and any other equipment necessary, Rule 17 sets forth the time frame within which <br /> Water Users are required to come into compliance with the Rules. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.