My WebLink
|
Help
|
About
|
Sign Out
Home
Search
DWR_3604557
DWR
>
Guidance Documents
>
2020
>
04
>
DWR_3604557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 10:07:11 AM
Creation date
4/22/2020 8:41:44 AM
Metadata
Fields
Template:
Guidance Documents
Document Type - Guidance Documents
Policy
Topic
Board of Examiners
Title
REVOKED POLICY 1990-1: EXEMPTIONS FOR GRAVEL PIT WELLS
Document Date
10/1/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />--f )ARD OF EXAMINERS OF WATER WELL CONSTRUCTION AND PUMP INSTALLATION CONTRACTORS <br />:ion of Water Resources <br />. A 3 Sherman Street, Room 818 <br />Denver, CO 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />http1/www.water.state.co-usAxe <br />BOARD POLICY 20004 <br />Exception for Gravel Pit Wells <br />Amended to Include "Pond Wells" <br />DISCUSSION: <br />Bill Owens <br />Governor <br />Greg E. Walcher <br />Executive Director, DNR <br />Hal D. Simpson, P.E. <br />secretary <br />At its meeting on June 6, 2000 the Board of Examiners of Water Well Construction and <br />Pump Installation Contractors reviewed the following policy to determine its <br />compatibility with the current procedures of the Division of Water Resources and the <br />complaint procedures of the Board, and the necessity of the policy since adoption of the <br />revised Water Well Construction Rules(2000). At its meeting on October 1, 2002 the <br />Board determined that "pond wells" are constructed essentially the same as gravel pits <br />and amended the existing policy to include pond wells permitted by the Ground Water <br />Commission or State Engineer. <br />Resolution 90-1; December 4, 1990, Gravel pit wells; October 1, 2002, Pond <br />wells. <br />As a result of its review, the Board determined that Resolution 90-1, although fully <br />applicable in its content and purpose, requires modification to coordinate the Rule <br />numbers referenced in the policy with the numbers in the revised Water Well <br />Construction Rules(2000). The number of the policy is also changed in accordance with <br />the sequence of policies recently adopted by the Board. <br />POLICY: <br />In accordance with Rule 10.1.6 of the Water Well Construction Rules(2000) and as a <br />continuance of the concepts set forth in Resolution 90-1, the Board of Examiners of <br />Water Well Construction and Pump Installation Contractors hereby adopts the following <br />policy- <br />1. Written requests for variance, as required by Rule 1S, for gravel pit well construction <br />shall not be required when such structures are permitted by the Colorado Ground <br />Water Commission under the provisions of Section 37-90- 107(6) and the State <br />Engineer under the provisions of Section 37-90-137(11), C.R.S., nor shall a variance <br />TIMOTHY L. DECKER, Montrose; H. RAY NEWMYER, Mosca: GLENN CLEMENT, Greeley <br />
The URL can be used to link to this page
Your browser does not support the video tag.