Laserfiche WebLink
killed or deep tilled if significant crop growth continues to occur during the irrigation season <br />absent irrigation supply. <br />G. Plan Year and H-1 Model Year Dry -up Claims <br />Due to the conflict between Replacement Plan years (April 1St through March 31St) and H-1 <br />Modeling periods (January 1St through December 31S), replacement plan proponents shall <br />indicate whether a dry -up claim is for the Plan Year of calendar year. For any dry -up parcel <br />irrigated during the period January through March of any year, but nominated for dry -up credit <br />after April 1 st (e.g. winter wheat), the plan proponent must provided a consumptive use <br />analysis consistent with the methodology used for H-1 Model crediting prepared by a registered <br />professional engineer to determine how to pro -rate the dry -up acreage for the partial H-1 Model <br />year. This analysis must be submitted by no later than May 1 st of the year in which the partial <br />credit is being claimed. An estimate of the reduction in consumptive credit to be used in the <br />Replacement Plan shall be provided with the March 1St plan submittal for purposes of plan <br />evaluation and approval. <br />H. Mapping by Division of Water Resources for Approved Parcels <br />Using GIS data provided by the plan proponents, Division 2 staff will prepare dry -up shapefiles <br />and mapping of the parcels approved in the replacement plan. This data and mapping will be <br />used by CDWR field staff and Kansas to monitor dry -up fields. Division 2 staff will attempt to <br />make this mapping available by April 15th of each year. Final mapping for dry -up affidavits will <br />be produced at the conclusion of the credit period (January 15th for calendar year dry -up and <br />April 15th for replacement year dry -up). <br />