My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-27_REVISION - C1996083 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-08-27_REVISION - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:25 PM
Creation date
8/28/2013 8:06:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
8/27/2013
Doc Name
Adequacy Letter
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
TR81
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />August 27, 2013 <br />William A. Bear <br />Bowie Resources, LLC <br />P.O. Box 483 <br />Paonia, CO 81428 <br />Re: Bowie No. 2 Mine (Permit No. C- 1996 -083) <br />Technical Revision No. 81 (TR- 81) <br />Gob Pile #2 Drainage and Topography Revision <br />Dear Mr. Bear: <br />COLORADO <br />ID I V I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The Division has completed a preliminary adequacy review of the technical revision application (TR -81) <br />submitted by Bowie Resources, LLC (BRL) for the Bowie No. 2 Mine. The revision proposes drainage and <br />postmining topography changes on Gob Pile #2 and the enlargement of Pond F. We have the following <br />comments and questions regarding the application. <br />1. The Table of Contents for Volume IX was last updated with PR -12 in November 2010. The page <br />numbers listed are largely outdated, Figure 4 is not listed, and the list of Stability Analyses does <br />not include the Buckhorn studies for TR -75, TR -76 and TR -81. Please update the Table of <br />Contents for Volume IX. <br />2. The Professional Certification provided with Volume IX was last updated with TR -64 in <br />December 2009. There have been a number of changes made to this volume since 2009, and <br />the list of Buckhorn engineers should be expanded to include Dan Quigley. Please update the <br />Professional Certifications for Volume IX. <br />3. On Page 1 of Volume IX, the second paragraph should be revised to reflect the approval of TR- <br />76. Please revise page 1 so the "current approved design" sentence in the middle of the <br />paragraph is updated, moved into a separate paragraph, and placed at the end of the history <br />narrative. <br />4. The pagination of revised page 4 of Volume IX doesn't fit with the currently approved version of <br />Page 5 that starts with "Diversion Ditches ". Please submit a revised page 4 that coincides with <br />the currently approved page 5. <br />5. Please update Page 4 of Volume IX, the "West Expansion" entries under the "Slopes" category <br />to reflect the "as- built" configuration with slopes as steep as 2h:1v approved with TR -75. <br />6. Revised page 10 of Volume IX indicates that Pond F will be cleaned when sediment <br />accumulation reaches 75% of the maximum storage, but further states that the ability to <br />remove sediment from pond F is contingent upon weather conditions. Two years of sediment <br />capacity and scheduled cleanouts at 75% capacity are recognized as best practices, and the <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.