My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-02-22_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2001-02-22_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:41:57 PM
Creation date
1/31/2013 6:59:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/22/2001
Doc Name
Approval
From
DMG
To
Climax
Type & Sequence
SR3
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 <br /> 7NERALS <br /> V I S I ON O F <br /> Phone.(303)866-3567 <br /> FAX:(303)832-8106 & <br /> GEOLOGY <br /> RECLAMATION <br /> February 22, 2001 1 MINING-SAFETY <br /> Bill Owens <br /> Mr. Bryce Romig Governor <br /> Climax Molybdenum Company Greg E.Walcher <br /> Climax Mine Executive Director <br /> Michael B.Long <br /> Climax, CO 80249 Division Director <br /> RE: Partial Reclamation Liability Release, Climax Mine, <br /> Permit No. M-1977-493, Revision No. SR-03 <br /> Dear Mr. Romig: <br /> Thank you for your letter of January 29, 2001 summarizing the status of Revision SR-03 to the Climax <br /> Mine reclamation permit. I am pleased to inform you that Revision SR-03 has been approved; the <br /> approval date for the revision was December 23, 2000. What follows in this letter is a discussion of the <br /> terms of the approval as outlined during the site inspections conducted on September 26 and October <br /> 24, 2000. Also provided is an update on the working reclamation cost estimate that forms the basis for <br /> the amount of Financial Warranty required to maintain the reclamation permit. A complete year 2001 <br /> re-estimate of reclamation costs for the Climax Mine is enclosed. <br /> 1. Storke Complex <br /> The Division of Minerals and Geology (DMG) through approval of Revision SR-03 releases Climax <br /> Molybdenum Company (CMC) from reclamation liability for backfilling and grading in a portion of <br /> Zn <br /> Storke Yard. Limitations to the release of reclamation responsibility for the Storke Complex are as <br /> follows: <br /> • Approximately 11 acres around 7-Shaft are not included in the release. <br /> • Approximately 9 acres where the buried Arkansas River channel will be reconstructed under the <br /> terms of the approved reclamation plan is not included in the release. <br /> • The immediate locations of 5-Shaft and the 5-Shaft head frame, and the immediate locations of the <br /> Storke Waste Water Treatment Plant, ponds and appurtenances are not included in the release. <br /> • Mining debris exposed in the Storke Yard backfill will be removed (see 9/26/00 inspection report). <br /> • Revegetation responsibility release was not requested by CMC and is not included. <br /> The reclamation costs for reconstruction of the Arkansas River channel, and for backfilling and grading <br /> in the 7-Shaft area have been completely re-estimated for the purpose of establishing the amount of <br /> required bond. This was necessary because one of the primary assumptions used in the previous <br /> estimates is no longer valid, i.e., that cut material generated during reconstruction of the river channel <br />
The URL can be used to link to this page
Your browser does not support the video tag.