Laserfiche WebLink
SPECIAL CONDITIONS <br /> Coal Basin/Sutey Pile Permit Revocation Project <br /> Permit Number: C-81-017 <br /> MVC-MINES-345 <br /> PROJECT LOCATION <br /> The Coal Basin Mine is located 4 miles west of Redstone in Pitkin County, Colorado. The <br /> mine is accessed via a paved service road. Please see the attached maps. <br /> WORK SUMMARY <br /> The project will be conducted on a mine site which was previously permitted by the State <br /> of Colorado Division of Minerals and Geology. The site was active as an underground <br /> mining operation from 1953 until 1991. The Colorado Mined Land Reclamation Board <br /> revoked the mining permit and forfeited the reclamation bond. The disturbances created <br /> as a result of activities at the site since August 3, 1977 are the subject of the reclamation <br /> activities addressed in this and subsequent Invitation To Bid documents. <br /> The project work will include the construction or reconstruction of drainage channels on the <br /> Sutey Coal Refuse Disposal Area (Sutey Refuse Area), and the distribution of topsoil on <br /> the Sutey Refuse Area to pre-determined depths. All final grades will be directed at <br /> achieving proper drainage and controlling erosion on the Refuse Area. All of the areas <br /> disturbed by this construction activity will be revegetated. In addition, the Number 5 Mine <br /> area will be mulched and revegetated due to a general lack of revegetation success upon <br /> previously seeded areas. <br /> PRE-BID MEETING AND SITE SHOWING <br /> A mandatory pre-bid meeting and site showing will begin at the coke ovens at the south <br /> turnoff to Redstone on State Highway 133. This mandatory meeting will begin on <br /> September 12, 1994 at 10:00 a.m. <br /> The Pre-Bid Meeting is for the purpose of showing prospective bidders the work site and <br /> vicinity. Bidders are advised to be prompt. A sign-in sheet will be available at the Pre-Bid <br /> meeting for firms to register their attendance. It is the bidder's responsibility to make <br /> certain their attendance is recorded on the sign-in sheet. Failure to sign-in or to attend the <br /> entire meeting may be cause for rejection of a bid. <br /> 1 <br />