Laserfiche WebLink
��OF coz <br /> I� p DEPARTMENT OF NATURAL RESOURCES <br /> ,tyn o yt� David H Getches,Executive Director <br /> T �\NF---- *� MINED LAND RECLAMATION DIVISION <br /> 18 e* DAVID C. SHELTON, Director <br /> Richard D.Lamm <br /> Governor <br /> January 24, 1985 <br /> MEMORANDUM <br /> TO: Jim Herron <br /> FROM: Jeff Deckler <br /> RE: Mid-Continent Bond <br /> I have reviewed the reclamation cost estimates developed for the Sutey coal <br /> refuse complex and rock tunnel to wash plant conveyor system. In doing so, I <br /> have made certain assumptions with respect to the machinery needed to perform <br /> the required work. It would be helpful in the future if all such as)stwiptions <br /> used to estimate your costs be included with the estimate, and all machine <br /> costs properly referenced. The Division finds as follows: <br /> 1 . Sutey Coal Refuse Complex <br /> The Division accepts the revised costs as presented in your letter of <br /> September 28. However, the evaluation by Schmueser Associates did not <br /> consider reclamation costs for reseeding the topsoil stockpile, <br /> reclaiming stream diversions, or reseeding beneath the conveyor. In <br /> addition, the 10% charge for administration and overhead was not <br /> included. With these considertions, the Division concludes that the <br /> bond presently held by the Division of $205,252.00 is sufficient for <br /> the purpose of setting bond in accordance with 3.02.2. <br /> 423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />