Laserfiche WebLink
January 24, 1985 <br /> Jim Herron Memorandum <br /> Page Two <br /> 2. Tunnel to Wash Plant Conveyor <br /> The Division accepts the revised haul distance for backfilling. <br /> However, in the machine cost estimates it appears that the hourly cost <br /> of operation (Rental Rate Blue Book, 1985) was not added to the rental <br /> rate to obtain a total machine cost/hr. Using machine costs from the <br /> Blue Rook, the revised reclamation cost estimate is: <br /> Facilities Removal $ 72,846 <br /> Backfilling and Grading 166,846 <br /> Topsoil Replacement 32,918 <br /> Portal Sealing 1,10() <br /> Revegatation 6,156 <br /> SUBTOTAL $ 279,217 <br /> 10% Overhead and Administration 27,921 <br /> TOTAL $ 307,138 <br /> In accordance with Rule 3.02.4(2)(a) the permittee may submit a <br /> replacement bond for the revised amount of $307,138. <br /> If you have any questions, please contact me. <br /> /wjh <br /> 7096F <br />