My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-28_REVISION - M1980244 (102)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-02-28_REVISION - M1980244 (102)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:09 PM
Creation date
3/9/2012 8:58:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
2/28/2012
Doc Name
VOL. 1, Exhibits D & E
From
CRIPPLE CREEK & VICTOR GOLD MINING COMPANY
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />MINING PLAN <br />This Exhibit, through reference to the sections itemized below, contains the description of <br />methods to be employed in mining the ore and overburden materials and associated <br />beneficiation of the ore for the Mine Life Extension 2. The mining methods at the <br />Cresson Project will remain much the same as currently approved. The Mine Life <br />Extension 2 primarily expands mining areas; adds a new Squaw Valley Leach Facility; <br />adds a new High Grade Mill; and adds a new Squaw Gulch Adsorption, Desorption, and <br />Recovery Plant to extend the operating life of the Cresson Project. The sections <br />referenced below provide a description of method(s) of mining to be employed; <br />discussion of earthmoving; water diversions and impoundments; the size of area(s) to be <br />worked; an approximate timetable for the operations. <br />Also referenced below are the sections which describe the nature, depth, and thickness of <br />the ore bodies to be mined; the primary and secondary commodities to be mined; and the <br />intended use. Gold and silver continue to be the primary commodities mined at the site. <br />The sections of the Project Description which describe processing at the new Squaw <br />Gulch Valley Leach Facility; the new Squaw Gulch Adsorption, Desorption, and <br />Recovery Facility; and the new High Grade Mill are also referenced below. <br />The information to address this Exhibit is contained in the Project Description in Sections <br />5.0, 6.0, 7.0, 8.0, 9.0, 10.0, 11.0, and 12.0 of Volume I of this application. The contents <br />of each section are described below. <br />Section 5.0 Mining and Operations Management Plan <br />Section 6.0 High Grade Mill Facilities <br />Section 7.0 Valley Leach Facilities <br />Section 8.0 Precious Metals Recovery Facility <br />Section 9.0 Support Facilities <br />Section 10.0 Surface Water Management <br />Section 11.0 Monitoring <br />Section 12.0 Reclamation and Closure <br />A number of appendices also contain information pertinent to the Mining Plan. These <br />appendices are referenced in the appropriate discussions in the Project Description which <br />follows these exhibits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.