Laserfiche WebLink
REASON FOR INSPECTION: <br />Normal I &E Program <br />BOND CALCULATION TYPE: <br />Complete Bond <br />BOND AMOUNT: <br />$7,500.00 <br />DATE OF COMPLAINT: <br />NA <br />POST INSP. CONTACTS: <br />None <br />JOINT INSP. AGENCY: <br />None None <br />WEATHER: <br />Cloudy <br />INf TO,It'S SIGNATURE: <br />SIGNATURE DATE: <br />December 23, 2011 <br />MINE NAME: <br />Cecil II Gravel Pit <br />MINE/PROSPECTING ID #: <br />M -1986 -124 <br />MINERAL: <br />Sand and gravel <br />COUNTY: <br />Washington <br />INSPECTION TYPE: <br />Monitoring <br />INSPECTOR(S): <br />Michael A. Cunningham <br />INSP. DATE: <br />December 13, 2011 <br />INSP. TIME: <br />12:00 <br />OPERATOR: <br />Donald G. Popejoy <br />OPERATOR REPRESENTATIVE: <br />None <br />TYPE OF OPERATION: <br />110c - Construction Limited Impact <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866 -3567 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Reclamation Success <br />PROBLEM /POSSIBLE VIOLATION: Problem: Mining at the Cecil II Gravel Pit has been complete for over five <br />years and the Operator has failed to complete reclamation. Construction Materials Rule 3.1.3 states that all <br />reclamation shall be carried to completion within five years from the date the Operator informs the Division <br />that mining is complete. <br />CORRECTIVE ACTIONS: The Operator shall complete reclamation of the site in accordance with the approved <br />Reclamation Plan by the corrective action date. The Operator shall notify the Division upon completion of <br />reclamation and shall request an inspection of the site. <br />CORRECTIVE ACTION DUE DATE: 12/13/12 <br />Page 1 of 4 <br />