Laserfiche WebLink
MINE NAME: <br />Patty's Pit <br />INE/PROSPECTING ID #: <br />N - 1998 -103 <br />MINERAL: <br />Sand and gravel <br />COUNTY: <br />Elbert <br />INSPECTION TYPE: <br />Monitoring <br />INSPECTOR(S): <br />Michael A Cunningham <br />INSP. DATE: <br />Dune 24, 2011 <br />INSP. TIME: <br />09:00 <br />OPERATOR: / <br />Town of Limon ✓ <br />OPERATOR REPRESENTATIVE: <br />Dave Stang <br />TYPE OF OPERATION: <br />110c - Construction Limited Impact <br />REASON FOR INSPECTION: <br />Normal I &E Program <br />BOND CALCULATION TYPE: <br />None <br />BOND AMOUNT: <br />$0.00 <br />DATE OF COMPLAINT: <br />NA <br />POST INSP. CONTACTS: <br />None <br />JOINT INSP. AGENCY: <br />None <br />WEATHER: <br />Clear <br />IZT R — 'S IGNATURE: <br />/ <br />IGNATURE DATE: <br />July 1, 2011 <br />,o COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY " <br />ye MINERALS PROGRAM INSPECTION REPORT <br />` PHONE: (303) 866 -3567 <br />* •876) <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Sediment Control <br />PROBLEM /POSSIBLE VIOLATION: Problem: Erosion gullies and ruts were observed in the northeast corner of <br />the site. This is a problem at this time for failure to protect the affected land from erosion pursuant to C.R.S. 34- <br />32.5 -116 (4) (j). <br />CORRECTIVE ACTIONS: The operator shall provide photo documentation to the Division verifying erosion gullies <br />and ruts have been repaired, and that the site has have been reconstructed and stabilized to prevent erosion <br />damage by the corrective action date. <br />CORRECTIVE ACTION DUE DATE: 7/15/11 <br />INSPECTION TOPIC: Topsoil <br />PROBLEM /POSSIBLE VIOLATION: Problem: Failure to follow approved reclamation plan, or current reclamation <br />plan needs to be updated and clarified pursuant to C.R.S. 34- 32.5 -116 (1). The operator must follow approved <br />reclamation plan or provide sufficient information to describe or identify how the operator intends to conduct <br />reclamation. <br />CORRECTIVE ACTIONS: The operator shall submit a Technical Revision, with the required $216 revision fee, to <br />update and clarify the current approved reclamation plan to reflect existing and proposed activities by the <br />corrective action date. The Technical Revision shall address the importation of topsoil and shall describe the <br />origin of the topsoil, the quality of the topsoil, and the approximate quantity which was imported. <br />CORRECTIVE ACTION DUE DATE: 7/15/11 <br />Page 1 of 4 <br />