Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />D I V I S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br /> Bill Ritter, Jr. <br /> Governor <br /> Mike King <br /> Executive Director <br />August 18, 2009 <br /> Loretta Pineda <br /> Director <br />Dumb & Dumber Trucking <br />Attention: Mr. Brian Barton <br />1957 County Road 57 <br />Sterling, CO 80751 <br />Re: Review of Technical Revision TR-01 for Barton Pit, Permit No. M-2000-149 <br />Dear Mr. Barton: <br />The Division of Reclamation, Mining, and Safety has completed its preliminary adequacy review of Technical <br />Revision 01 for the Barton Pit addressing changes to the mining and reclamation plans. The TR was called <br />complete for review on August 11, 2010. All comment and review periods began on August 11, 2010. The <br />decision date for this TR is September 10, 2010. Please be advised that if you are unable to satisfactorily <br />address any concerns identified in this review before the decision date, it will be your responsibility to <br />request an extension of the review period. If there are outstanding issues that have not been adequately <br />addressed prior to the end of the review period, and no extension has been requested, the Division will <br />deny this TR and you may be subject to enforcement action. In order to allow the Division adequate time <br />to review your responses to any adequacy issues, please submit your adequacy responses to the Division <br />no later than one week prior to the decision date (September 3, 2010). <br />The review consisted of comparing the application content with specific requirements of Rule 6.1, 6.2, 6.3 and <br />6.5 of the Minerals Rules and Regulations of the Colorado Mined Land Reclamation Board for the Extraction of <br />Construction Materials. In general the revision was substantially adequate; however, as with most revisions <br />there are a few items that will require clarification of the existing information. Any inadequacies are identified <br />under the respective exhibit heading. <br />6.3.3 - Mining Plan <br />a) Adequate as submitted. <br />b) Please show on revised copy of mine plan map where topsoil stockpile will be located, and describe how <br />topsoil stockpile will be stabilized (seeding or other) and kept weed free. As submitted, section 6.3.4 i) <br />of the reclamation plan states that 6" of topsoil will be replaced after final sloping is completed. Please <br />change 4" to 6" in this section to be consistent with submitted reclamation plan. <br />c) Please also show location of overburden stockpiles on revised copy of mine plan map. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines