Laserfiche WebLink
Cripple Creek & Victor Gold Mining <br />A Joint Venture - ANGLOGOLD ASHANTI (COLORADO) CORP., Manager <br />Operations Office <br />P.O. Box 191 - 100 North 3"' Street <br />Victor, Colorado 80860 <br />(719) 689-2977 - Fax (719) 689-3254 <br />May 21, 2010 <br />SENT CERTIFED, RETURN RECEIPT REQUESTED <br />7009-2820-0003-2825-6028 <br />Mr. Berhan Keffelew -rR _ E59 <br />Environmental Protection Specialist <br /> <br />Colorado Department of Natural Resources c Will) <br />Division of Reclamation, Mining and Safety MAY 2 5 2010 <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 Diviaion of NGc?=A:ion, <br />Denver, Colorado 80203 Minirtrq and Safety <br />Re: Permit No. M-1980-244• CriDple Creek & Victor Gold Mining Company ("CC&V" )• <br />Cresson Protect; - Request for Technical Revision ("TR-59") Liner System Enhancements on <br />the Valley Leach Facility ("VLF") -LOB Pad Liner and Phase IV B/C Triangle Project <br />Dear Mr. Keffelew: <br />CC&V proposes the following minor changes as part of this request for Technical Revision (TR- <br />59) to the Amendment No. 9 to Permit M-1980-244: Liner System Enhancements on the VLF. <br />The improvements to the liner system are in two separate areas of the VLF. <br />Phase IV B/C Triangle Proiect <br />A triangular area previously outside the boundary of the liner system at the union of Phases <br />IVB and IVC has been lined (please refer to attached AMEC Earth and Environmental <br />("AMEC") design drawing dated May 11, 2010). The additional lined area results in a more <br />contiguous lined area footprint and increased containment capabilities of the VLF. <br />Please refer to attached AMEC drawing "Phase IV B/C Triangle Project, Liner Details", <br />dated May 11, 2010 for additional detail. This project will be installed per specifications <br />outlined in Amendment No. 9 for clay and geosynthetic liner installation as an area for ore <br />storage on the VLF. Even though the Triangle Area will be constructed to accept ore storage <br />and processing, it is not planned for that use as such at this time. Therefore, the current <br />stability analysis submitted with Amendment No. 9 does not change, as CC&V is not <br />proposing a change to the ore stacking plan nor the volume of material to be processed. <br />Should the plan for the total volume of material change on the VLF footprint area, then <br />DRMS will be notified and the financial warranty will be adjusted accordingly. Construction <br />quality assurance will be provided by AMEC. An as-built report will be submitted to DRMS <br />in a timely manner upon completion of the project