Laserfiche WebLink
<br />I A5K LIST (DIRECT TS) <br />NO. TASK DESCRIPTION .. .. _ <br />FORM <br />USED <br />FLEET <br />SIZE ::: <br />TASK <br />HOURS <br />DIRECT <br />COST <br />001 <br />002 <br />003 <br />004 <br />005 -Mobilize/Demobilize Equipment <br />-Grading down overburden stockpile <br />-Replacing Topsoil <br />-Ripping compacted areas <br />-Revegatation around the lake mobilize <br />dozer <br />scraper1 <br />dozer <br />revege 1 <br />1 <br />1 <br />1 <br />1 5.3 <br />8.0 <br />7.1 <br />1.7 <br />6.0 $1, 766 <br />$1,291 <br />$1,961 <br />$309 <br />$1,095 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 28.2 $6,422 <br />?? ?..?....w ?nu.1 - iauui autusunen[ or . IVA %u TOTAL DIRECT COST $6,422 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $130 <br />Performance bond : 1.05 % of direct total = $67 <br />Job superintendent : NA" NA NA total = NA <br />Profit : 10.00 % of direct total = $642 <br />not required (or eqp. operator serves as super.) TOTAL O & P = $839 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) = $7,261 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $363 <br />CONTINGENCY- NA*. NA total = NA <br />"contingencies accounted for at task level TOTAL INDIRECT COST = $1,202 <br />TOTAL BOND AMOUNT (direct + indirect) _ $7,624