Laserfiche WebLink
CIRCES Cost Estimating Software <br />MENT MOBILIZATION / DFMnRII I: <br />PROJECT IDENTIFICATION <br />Agency or organization name <br />sheet 1 of 2 <br />Colorado Division Of Reclamation, Mining And Safety <br />Task #: 001 State :Colorado <br />Date : 01/09/2009 County :Morgan <br />User : MAC Site : Green Bros. Pit #2 <br />Permit/job #:M-1995-030 <br />Abbreviation :none <br />Filename : M030-001 <br />Permit or other job action : Succession Of Operator Bond Calculation <br />Task description :Mobilize/Demobilize Equipment <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift b 1 <br /> asis . per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22033 <br /> Operating cost/hour : $44.38 $46.13 $50.07 <br /> Operator cost/hour : $27.66 $27.66 $27.66 <br /> Helper cost/hour:, $0.00 $25.39 $25.39 <br /> Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />-Cost/fleet <br />-Cat D8R Series /l E-8U (200 52.30 $50.59 $125.45 1 $176.04 $125.45 $0.00 <br />-Cat 621G 35.55 $161.33 $117.55 1 $161.33 $161.33 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $337.37 $286.78 $0.00