My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-14_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2009-01-14_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:42:52 PM
Creation date
1/15/2009 10:18:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
1/14/2009
Doc Name
Adequacy Response
From
Peak Project Management, LLC
To
DRMS
Type & Sequence
RN5
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peak Project Management, LLC <br />34115 County Road 20.8 Trinidad, CO 81082 <br />Telephone: (719) 846-4975 Fax: (719) 846-4930 Cell: (719) 859-0111 <br />ronthompson@wildblue.net <br />January 10, 2009 <br />Mr. Kent Gorham <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: New Elk Mine <br />Permit No. 81-012 <br />Bonding for New Facilities <br />Dear Mr. Gorham: <br />?? ;I pN 1 `4`909 <br />ision of K °imration, <br />L'' ` t?Ainin j?a??'s?ety <br />The new facilities consist of the re-installation of the East Portal Fan and the East Portal Hoist <br />House. These facilities were previously dismantled, but were never Phase I bond released. <br />Therefore, bonding should still be in place for these facilities. The attached schedule estimates <br />the operator calculated change in bonding for these two facilities. <br />If you have any questions, please call me. <br />S <br />Ronald Thompson <br />Agent <br />Enclosure: <br />RN-5 Bonding Schedule
The URL can be used to link to this page
Your browser does not support the video tag.