My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-14_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2009-01-14_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:42:52 PM
Creation date
1/15/2009 10:18:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
1/14/2009
Doc Name
Adequacy Response
From
Peak Project Management, LLC
To
DRMS
Type & Sequence
RN5
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RN-05 Bonding Schedule <br />The following facilities are being reinstalled as part of the reopening of the New Elk Mine. <br />The facilities are already approved and are covered by a reclamation bond. The purpose <br />of this schedule is to provide information reqarding the replacement facilities and their <br />projected cost of reclamation. <br />EAST PORTAL FAN INSTALLATION. <br />The original East Portal Fan was removed from the permit area. The fan house remains <br />in place adjacent to the air shaft and will be used to house the drive motor and electrical <br />control system for the fan. The building and foundations for the old fan are covered by <br />a reclamation bond. The replacement facilities include the main fan housing for a 96 inch <br />axial vane fan, steel fan duct work including airlock access, steel box structure over the <br />ventilation shaft, explosion doors and automatic closing doors. <br />East Portal Fan House 30' x 14' x 10' 4200 CF $ 0.139 583.80 <br />Concrete Pad 20' x 10' x 12" 200 SF $ 1.420 284.00 <br />Steel Duct Work 18' x 18' x 10' 3240 CF $ 0.139 450.36 <br />Fan with Evase' and inlet Cone 10000 lbs. $ 0.250 2,500.00 <br />TOTAL DIRECT COST $3,818.16 <br />EAST PORTAL HOIST HOUSE <br />The dimensions given for the original hoist house as listed in Exhibit 22 Bond Calculations <br />will be similar to the new installation. The new facility will include a steel structure to house <br />the hoist unit and controls. <br />Hoist House 54'x 42'x 24' <br />Concrete Pad 54'x 42'x 24" <br />Hoist Unit and Controls <br />TOTAL DIRECT COST <br />54432 CF $ 0.139 $ 7,566.05 <br />168 CY $ 82.000 $13,776.00 <br />18000lbs $ 0.250 $ 4,500.00 <br />$25,842.05 <br />Estimated Change in Bond Amount Required: <br />Existing Bond for above facilities <br />New Bond Amount <br />Additional Bond Required <br />Overhead & Profit @ 12.6% <br />Project Mgmt @ 10.25% <br />Total Additional Bond Required <br />20,752.97 <br />29,660.21 <br />8,907.24 <br />1,122.31 <br />1,028.03 <br />$11,057.58
The URL can be used to link to this page
Your browser does not support the video tag.