My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-30_REVISION - M2000030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000030
>
2007-11-30_REVISION - M2000030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:17:05 PM
Creation date
12/5/2008 12:47:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
REVISION
Doc Date
11/30/2007
Doc Name
Response to adequacy review
From
Elam Construction
To
DRMS
Type & Sequence
AM1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4-;M?l <br />November 26, 2007 <br />Ms. Kate Pickford <br />R1L, <br />DEC 11, 2007 <br />Division of Reclamation, <br />Mining and \afety <br />State of Colorado <br />Division of Reclamation, Mining and Safety <br />Durango Field Office <br />701 Camino del Rio, Ste. 315 <br />Durango, CO 81301 ,/0 <br />Re: Elam Consction, Inc. File # M-2000-0 <br />3 <br />Agri- DLD Gravel Pit 112c; Response to Adequacy Review <br />Dear Ms. Pickford: <br />Y...q <br />i6? a) 0 '007 <br />rJ14J1@liUi1 'v, i f <br />i linii j cind Sa7fc L <br />The following is in response to your letter of October 26, 2007. Responses follow the <br />same sequence as listed in your letter. The last section discusses potential future revisions <br />to the mining plan in regard to underground gas pipeline removal/ relocation. <br />1. Rule 1.6.5 (2) <br />Enclosed are a copy of proof of publication of the public notice that appeared <br />in the Durango Herald and copies of proof of service of this notice to <br />landowners within 200 feet of the affected land. <br />2. Rule 6.4.5 Exhibit E - Reclamation Plan <br />The intent of the applicant is to reclaim Phase 7 as soon as the current mining <br />in this phase is completed. The other phases within the original permit <br />boundary (Phases 1-6) will not be reclaimed until the cessation of mining. This <br />area is currently utilized for processing, stockpiling and staging. It is <br />anticipated that this area will be used as such throughout the life of the mine as <br />amended. <br />The initial phase to be opened for mining on the amended area is also to <br />remain un-reclaimed until the end of operations. This initial phase will serve <br />additional processing and stockpile purposes. The area of this phase is <br />approximately 10 acres. The remaining area in the amended affected land will <br />be reclaimed as each 10 acre section is depleted. <br />3. Rule 6.4.19 Exhibit S- Permanent Man-made Structures <br />Enclosed are copies of two separate notarized agreements: The first is in <br />regard to the existing underground gas pipelines owned by XTO. The second <br />agreement deals with the perimeter fencing owned by Byron and Kristin <br />Hilliard (amended area landowners).
The URL can be used to link to this page
Your browser does not support the video tag.