Laserfiche WebLink
• ti <br /> 999 <br /> �..Wok CLIMAX MOLYBDENUM COMPANY <br /> A DIVISION OF JXMAQLX INC. <br /> HENDERSON MINE ;t34- o.2-o <br /> Box 68 <br /> Empire, Colorado 80438 <br /> (303) 569-3221 <br /> March 7 , 1980 R ECL.I� /G <br /> RR MAR 1 0 1980 <br /> Joseph Sullivan, Chairman MINED LAND RECLAMATION <br /> Mined Land Reclamation Board , 1 <br /> Centennial Building , Room 723 Colo. Dept. of Natural Resources 1313 Sherman StreetY% '�G� ✓. <br /> Denver , Colorado 80203 <br /> Re : 1979 Annual Report, Henderson Mining Permit #77342 <br /> Dear Mr . Sullivan: <br /> Mining and reclamation at the Henderson mine and mill <br /> again proceeded almost exactly as depicted in the applica- <br /> tion . Our rate of production is presently about 28 , 000 tons <br /> per day. Our total work force is up to about 1940 people . <br /> Reclamation proceeded in accord with the timetable <br /> (Section 5 ) and the Reclamation Plan (Section 9 ) . Species <br /> planted during 1979 were those committed to in the approved <br /> plan ( Section 9 ) plus some . The list submitted last year has <br /> not changed significantly. Planting times and locations de- <br /> scribed in the reclamation plan were adhered to . Maintenance <br /> and establishment fertilizer rates were applied in accordance <br /> with the plan. In general , materials used were 8 tons of <br /> 34-0-0 (N-P-K ) fertilizer , 1 ton of 20-20-10 (N-P-K ) <br /> fertilizer , 20 rolls of excelsior mat, 3, 000 shrubs and <br /> trees , 1/2 ton of grass seed , and 3 pounds of wildflower and <br /> shrub seed . 1979 was a good growing season with a fairly <br /> even distribution of precipitation throughout the year . The <br /> quality and quantity of vegetation increased accordingly. <br /> Topsoiling of mine yard slopes was postponed due to the <br /> diesel fuel shortage during the summer months. This project <br /> will resume in 1980 . Sparse areas were spot reseeded with <br /> grass seed . The wildflower seed mix and some shrub seeds <br /> were planted on various slopes at the mine site . Shrub and <br /> tree density was increased with the addition of 2,000 more <br /> plants in selected locations . <br /> a. � <br />