My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP45896
DRMS
>
Back File Migration
>
Report
>
REP45896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:48:50 AM
Creation date
11/27/2007 10:45:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
2/17/1988
Doc Name
1987 ANNUAL REPORT HENDERSON MINING PN 77-342
From
CLIMAX MOLYRDENUM CO
To
MLRB
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />CLIMAX MOLY~Dt=~IUM COMPAN'1/ <br />A DIVISION OF A/YAAx INC. <br />HENDERSON MINE <br />Box 68 <br />Empire, Colorado 80438 <br />(303) 569-3221 <br />February 11, 1988 <br />CERTIFIED MAIL N0. ~6~0 929 s~z8 <br />Ms. Margaret Winter ~~~~ ~~ ~~ <br />Chairperson <br />Mined Land Reclamation Board 7 ~ggg <br />423 Centennial Building FEE11 <br />1313 Sherman Street I~INEp L,pi~v <br />Denver, Colorado 80203 pIVIS1ON <br />[~tCLAMAT101`1 <br />Re: 1487 Annual Report - Henderson Mining Pee9nit No. 77-342 <br />Dear Ms. Winter: <br />Reclamation at the Henderson mine and mill proceeded as described in the plan. <br />The rate of production was 27,700 tons/day on a 21 day/month schedule at the <br />beginning of 1987 and finished the year at 16,500 tons/day on a 17 day/month <br />schedule. Our work force at the beginning of the year was 100 and by the end <br />of December was reduced to 347. <br />Reclamation proceeded as described in the Timetable (Section !i) and the <br />Reclamation Plan (Section 9). Species planted during 1987 were those <br />originally listed in the reclamation plan and appropriate addition<.; mentioned <br />in previous annual reports. Less than one hundred pounds of the grass seed <br />mix were broadcast on some construction and repair di~:turbances. <br />Precipitation was average throughout the growing season and reveget:ated areas <br />responded accordingly. <br />RECLAMATION AREA ACTIVITIES <br />Reclamation of disturbances as they occur and efforts to minimize disturbance <br />by planning and reduction of unnecessary uses continue to be our aim. <br />Treatment in the following described area demonstrates our adherence to this <br />guideline. <br />Area 9 <br />Another slope on tailing dam number one was covered with soil salvaged from <br />within the tailing basin. A total of 7,086 cubic yards of soil was placed to <br />an average depth of one foot in September and October, and the fivE~-acre area <br />was reseeded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.